NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/E-Mails Hotline M. Gilsenan
Document / 20 pages

Updated WTC cleaning and monitoring scopes of work, July 2002

Machine-extracted title · confidence 74%

Distribution of updated statement of work documents for WTC cleaning and monitoring programs.

NYC-WTC_000138585–000138604

Folder label: “E-Mails Hotline M. Gilsenan

Page image
Scanned page image, NYC-WTC_000138599
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

samples, EPA Project Tracking Numbers, the laboratory address, date, and sample IDs in an agreed upon electronic format or website approved by EPA within 24 hours of activity.

5. The Monitoring contractor shall evaluate all HVAC systems in all residential buildings where cleaning will take place to determine ifthese systems have been impacted by dust or debris from the collapse of the World Trade Center and if these systems require cleaning. In cases where cleaning is requested for a whole building, the building’s HVAC system will be evaluated as a whole. Incases where cleaning is requested for individual residential unit, portions ofthe HVAC system dedicated to that unit will be evaluated. No residential or common space shall be cleaned until the HVAC system has been evaluated and cleaned as necessary.

The Monitoring contractor shall inspect HVAC systems or portions thereof cleaned to verify cleanliness. X

HVAC assessments, cleaning, and cleanliness inspections shall be conducted in accordance with the National Air Duct Cleaners Association (NADGA) General Specification for the Cleaning of Commercial Heating, Ventilating and Air Conditioning Systems and the NADCA Assessment, Cleaning and Restoration Standard (ACR2002). Qualified personnel shall perform the HVAC evaluation and cleanliness inspections. At a ininimum such personnel shall have an understanding of HVAC system design and experience in utilizing accepted indoor environmental sampling practices, current industry HVAC cleaning procedures, and applicable industry standards.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free ofclerical errors.

The Project Monitor shall record if the HVAC systems have been evaluated and cleaned subsequent to September 11,2001. Ifyes, when and by whom. This information shall be provided via F2L or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

6. In the event that mold is observed in a residence during the pre-cleaning inspection, the Monitoring Contractor will contact the NYCDOH and EPA.

Deliverables

The Project Monitor shall record if mold is present and notify the NYCDOH and EPA. This information shall be provided via EPA Indoor Air web database or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

NYC-WTC_000138599

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138599Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →