NYC 9/11 Public Portal Document
Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 — Rev 1, August 11, 2005
2.13.5.2 Non-Life-Threatening Incident
Should it be determined that no threat to life is present, a co-worker will assist the injured person
and contact the Contractor SSM as soon as reasonably possible. Should the victim be injured in
the Exclusion Zone, a rapid decontamination consisting of Tyvek, glove and respirator removal
shall be performed in the Contamination Reduction Zone prior to initiation of medical assistance.
For all non-life-threatening injuries, all medical assistance shall be provided in the Support Zone
to reduce the spread of contamination to medical personnel or equipment.
2.13.6 Bloodborne Pathogens
When an emergency occurs that involves the potential for contact with bodily fluids, personnel
shall use procedures and PPE that minimize the potential for exposure.
All personnel who provided direct support to an injured person shall participate in a post-incident
exposure review during which their role in the event and the potential for contact with bodily
fluids shall be evaluated. The information relating to exposure shall be documented for each
individual. The procedures for the post-exposure consultation identified in the OSHA
Bloodborne Pathogens Standard (29 CFR 1910.1030) shall be followed.
All personnel on-site shall receive awareness training concerning Bloodborne Pathogens (BBP)
and the procedures to be followed to respond to emergencies that occur on-site. This awareness
training shall be provided by each Subcontractor prior to the initiation of work activities and
when new employees are introduced to the Site. In addition, each Subcontractor must have a
BBP plan.
3.0 DOCUMENTATION
Each Subcontractor shall maintain documentation, as established by the Contractor, which shall
record, at a minimum, the following information:
• The Subcontractor employees on Site, including arrival and departure times and their
destination at the Site.
• Information required to be maintained by the OSHA respiratory protection standard,
including medical clearance documents, training and certification records, fit-test records,
and the results of personal air monitoring used to determine employee exposures.
Additionally, all medical and sampling documentation required by OSHA's Lead in
Construction standard must be maintained.
• Area air testing results
• Incidents and unusual activities that occur at the Site, including but not limited to injuries,
illnesses, accidents, spills, breaches of security, equipment failures, weather-related
problems and near-misses.
34
NYC-WTC 000135028
OCR can misread numbers and units. Confirm readings against the page image before using them.