NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 55/No folder label
Document / 274 pages

EPA work plan review, 133-135 and 21-23 buildings, August 2005

Machine-extracted title · confidence 75%

EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.

NYC-WTC_000134871–000135144
Page image
Scanned page image, NYC-WTC_000134885
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part I: Work Plan — Decontamination/Deconstruction 133-135 Greenwich Street and 21-23 Thames Street Airtek Project 05-0701— Rev 2 August 10, 2005

1.0 General

The Copper Group, Inc. has engaged Airtek Environmental Corp. (Airtek) to prepare the following project plan in support of the de-construction of the buildings located at 133- 135 Greenwich Street and 21-23 Thames Street, New York, NY. This plan is in response to a request by the WTC Regulators for a documented approach to the project.

Though it sustained little physical damage, the buildings at 133-135 Greenwich Street and 21-23 Thames Street were impacted in places by fallout from the events of September 11, 2001. It is the Owner's intent to conduct abatement of in-place asbestos, and to effect a decontamination of the interior of the building so that conventional demolition activities can be completed.

2.0 Related Submittals

2.1 Community Air Monitoring Plan

Prior to initiation of any decontamination/deconstruction operations, an Environmental Community Air Monitoring Plan (ECAMP) developed by an Airtek CIH, and approved by the USEPA will be established and operational. The Program will consist of daily air monitoring at three points on the perimeter of the project site. Monitoring will be conducted in accordance with the attached Environmental Air Monitoring Specification, Community Monitoring will continue until building demolition is complete. The ECAMP is included as Part II of the submittal Package.

2.2 Health & Safety Plan

A Certified Industrial Hygienist (CIH) from Airtek has developed a site-specific HASP to be applied to all site decontamination operations. The HASP details requirements for access/egress and requirements for Personal Protective Equipment for workers at the site. The HASP is included as Part III of the submittal package.

2.3 Waste Management Plan

A Certified Industrial Hygienist (CIH) from Airtek has developed a site-specific Waste Management Plan (WMP) to be applied to all waste operations for the site. The WMP provides details on how, and by whom, waste determinations and categorizations will be made, and provides detail on sampling and analysis protocols. The WMP is included as Part IV of the submittal package.

3.0 Environmental Regulatory Submittals

NYC-WTC 000134885

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134885Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →