Carpentry
• H. Cut and fit threshold and floor covers to profile of door frames, with mitered comers and
hair-line joints. Join units with concealed welds or concealed mechanical joints. Cut
smooth openings for spindles, bolts and similar items, if any.
All keys used shall be construction keys which are to be tagged with fiber discs as
approved, clearly labeled with Identifying inscriptions and then neatly arranged in a
temporary cabinet. All construction keys shall be returned to the Owner.
J. Adjusting and Cleaning
1. Adjust and check each operating Item of hardware and each door, to ensure
proper operation of function of every unit. Lubricate moving parts with type
lubrication recommended by manufacturer (graphite type if no other
recommended). Replace units, which cannot be adjusted and lubricated to
operate freely and smoothly as intended for the application made.
2. Final Adjustment: Whenever hardware installation is made more than one month
prior to acceptance or occupancy of a space or area, return to the work during
the week prior to acceptance or occupancy, and make a final check and
adjustment of all hardware items in such space or area. Clean and re-lubricate
operating items as necessary to restore proper function and finish of hardware
and doors. Adjust door control devices to compensate for final operation of
heating and ventilating equipment.
3.03 INSTALLATION OF DOORS AND FRAMES
A. Steel Doors and Frames
1. Install hollow metal units and accessories in accordance with the final shop
drawings, Manufacturer's data, and as herein specified.
2. Setting Masonry Anchorage Devices
a. Provide masonry anchorage devices where required for securing hollow
metal frames to in-place concrete masonry construction.
b. Set anchorage devices opposite each anchor location, in accordance with
details or final shop drawings and anchorage device Manufacturer's
instructions. Leave drilled holes rough, not reamed, and free from dust
and debris.
c. Provide loose lintels If conditions require them.
3. Placing Frames: Set frames accurately in position, plumbed, aligned, and braced
securely until permanent anchors are set. After wall construction Is complete,
remove temporary braces and spreaders, leaving surfaces smooth and
undamaged.
a. In masonry construction, building-in of anchors and grouting of frames is
included in Section 04200 of the specification.
b. At in-place concrete or masonry construction, set frames and secure In
place with machine screws and masonry anchorage devices.
•