130 Cedar Street July 15, 2004 Carpentry
C. Bolts: Standard mild steel, square head machine bolts with square nuts and malleable iron or steel plate washers or carriage bolts with square nuts and cut washers conforming to the following:
1. Bolts: FS-FF-B-575 and 584.
2. Nuts: FF-N-836D.
3. Expansion Shields: FS-FF-B-561.
4. Toggle Bolts: FS-FF-B-561.
5. Lag Screws and Botts:_ FS-FF-B-561.
D. Wood Screws: Per Fed. Spec. FF-S-111 D.
E. Concrete and Masonry Anchors: Standard expansion shield self-drilling type concrete anchors where so shown or noted on the drawings, or where approved by Architect. PART 3.00 - EXECUTION
3.01 INSPECTION
A. Examine the areas and conditions where carpentry is to be installed and notify the Architect of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions are corrected to permit proper installation of the work.
3.02 INSTALLATION OF FINISH HARDWARE
A. All finishing hardware specified In Section 08700 of this specification entitled "Door Hardware" shall be received, accounted for, stored and applied under this Section.
B. Hardware shall be sorted and stored in space assigned by Contractor and shall be kept at all times under lock and key. The safety and preservation of all items delivered will be the responsibility of the Contractor.
C. Hardware shall be carefully fitted and securely attached, in accordance with these specification and the Instructions of the various manufacturers.
D. Unless otherwise noted, mount hardware units at heights established in Section 08100.
E. Install each hardware item in compliance with Manufacturer's Instructions and recommendations. Wherever cutting and fitting Is required to install hardware onto or Into
surfaces which are later to be painted or finished in another way, install each item completely and then remove and store In a secure place during the finish application. After completion of the finishes, re-install each Item. Do not install surface-mounted items until finishes have been completed on the substrate.
F. Set units level, plumb and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper Installation and operation.
G. Drill and countersink units which are not factory prepared for anchorage fasteners. Space fasteners and anchors In accordance with industry standards.
06200-4
NYC-WTC 000125194
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Similarity score 0.913 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166810
Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.
Similarity score 0.912 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Similarity score 0.910 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
Similarity score 0.908 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168166
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, regarding WTC/PA TAA application forms.
Similarity score 0.907 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
Similarity score 0.907 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer