NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.
NYC-WTC_000166810–000166826Folder label: “Pre-Engineered Blast Doors”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
. U N Z.J/JU z.U . UU ijoJU 231 / lUU 1-UN I ANA HL I AL ®009/013
a - OVERLY BLAST DOORS - SHORT FORM SPECIFICATION GUIDE
Hydraulic Closers [ 1/reqiJiretf] shall conlbrm to ANSI Standard Al 56 4
Hinges shall be heavy duty ball bearing butts of sufficient size and quantity to withstand blast loadings and dour weight Hinges shall confonn to ANSI Standard Ai56.1.
2.2 Fabrication
A. General: Assemble work using all welded construction conforming to the applicable requirements of AWS Dll.
B. Materials: Construct from formed sheet conforming to ASTM A366 or ASTM A569. Steel plate and shapes for reinforcing and/or framing members shall conform to ASTM A36 and bars shall conform to ASTM A108 Grade 1018. Hardware shall be corrosion resistant steel of the appropriate design for the function intended.
C. Weatherstripping Ji/required}: Provide ___ [CAoo.se one: Closed cell sponge /or/ solid] neoprene elastomer seals,
D. Painting and Cleaning: After fabrication, remove all tool marks and surface imperfections, and dress all welded joints .smooth and coat with a rusf-inhibitivc primer.
Part 3 - Quality Control
Quality Control: Manufacturer shall submit evidence of having been engaged in the de.sign and manufacture of similar blast resistant door assemblies for a minimum of 10 years.
Part 4 - Execution
4 1 Site Storage and protection of Materials: Store all material in a dry controlled area Io protect from damage.
4.2 Installation; Install work in strict accordance with approved shop drawings and recommended installation instructions of the manufacturer. Any required field welding must be performed by certified weldeis in accordance with AWS DlJ
J
NYC-WTC_000166817
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
1 shared topics · Same agency, volume and box · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173050
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and fire doors.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173374
Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172431
Product feature description for Insulgard ICDS bullet-resisting door systems including heavy-duty aluminum construction dated May 1998.
1 shared topics · Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172426
Fax quote form from Insulgard Corporation for bullet-resisting door systems at the World Trade Center dated May 1998.
1 shared topics · Same agency, volume and box · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173223
Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168106
Portfolio document detailing selected boardroom and conference room projects completed by KBI Systems over three years.
1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Same agency, volume and box · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similar document embedding; no shared entity or topic indexed. · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
Similarity score 0.930 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
Similarity score 0.925 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.924 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172431
Product feature description for Insulgard ICDS bullet-resisting door systems including heavy-duty aluminum construction dated May 1998.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Similar indexed content
NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
Similar indexed content
NYC-WTC_000173050
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and fire doors.
Similar indexed content
NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
Similar indexed content
NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
Similar indexed content