NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Pre-Engineered Blast Doors
Document / 17 pages

Pre-hung door specification sheet with dimensions and ratings

Machine-extracted title · confidence 95%

Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.

NYC-WTC_000166810–000166826

Folder label: “Pre-Engineered Blast Doors

Page image
Scanned page image, NYC-WTC_000166817
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

. U N Z.J/JU z.U . UU ijoJU 231 / lUU 1-UN I ANA HL I AL ®009/013

a - OVERLY BLAST DOORS - SHORT FORM SPECIFICATION GUIDE

Hydraulic Closers [ 1/reqiJiretf] shall conlbrm to ANSI Standard Al 56 4

Hinges shall be heavy duty ball bearing butts of sufficient size and quantity to withstand blast loadings and dour weight Hinges shall confonn to ANSI Standard Ai56.1.

2.2 Fabrication

A. General: Assemble work using all welded construction conforming to the applicable requirements of AWS Dll.

B. Materials: Construct from formed sheet conforming to ASTM A366 or ASTM A569. Steel plate and shapes for reinforcing and/or framing members shall conform to ASTM A36 and bars shall conform to ASTM A108 Grade 1018. Hardware shall be corrosion resistant steel of the appropriate design for the function intended.

C. Weatherstripping Ji/required}: Provide ___ [CAoo.se one: Closed cell sponge /or/ solid] neoprene elastomer seals,

D. Painting and Cleaning: After fabrication, remove all tool marks and surface imperfections, and dress all welded joints .smooth and coat with a rusf-inhibitivc primer.

Part 3 - Quality Control

Quality Control: Manufacturer shall submit evidence of having been engaged in the de.sign and manufacture of similar blast resistant door assemblies for a minimum of 10 years.

Part 4 - Execution

4 1 Site Storage and protection of Materials: Store all material in a dry controlled area Io protect from damage.

4.2 Installation; Install work in strict accordance with approved shop drawings and recommended installation instructions of the manufacturer. Any required field welding must be performed by certified weldeis in accordance with AWS DlJ

J

NYC-WTC_000166817

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166817Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared topics · Same agency, volume and box · similarity 0.902

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →