NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Door Schedule
Document / 16 pages

Door schedule specifications, Office of Emergency Management, 1998

Machine-extracted title · confidence 95%

Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.

NYC-WTC_000173374–000173389

Folder label: “Door Schedule

Page image
Scanned page image, NYC-WTC_000173374
OCR text

OCR status: ocr · source: ours

NYC-WTC_000173374 Office of Emergency Management 7 World Trade Center New York, New York 10048 SHCA Project No. 5576A SWANKE HAYDEN CONNELL ARCHITECTS * Revision #1, May 15, 1998 Addendum #1 Door Schedule Door Jamb Opening Frame Data Door Data Floor Tag Width | Height Jamb | Head } Material Type | Material | sit | Thk. UL Rating Label (Hrs) Hardware Set Remarks 1A 3-0" 8'-0" 23RD 1B 3-0" 8'-0" 2A 3'-8" 8-4" 2B 3'-8" 8'-4" 2c 2'-10" 8'-0" 2D (2) 2'-101/2" 8'-0' 3 3'-0' 8'-0' 4 3'-0° 8'-0' 5 (2) 3-0" 8-0" 6 3-0" 8'-0' TA 3-0 8'-0' 7B 3-0" 8'-0 Door & frame by insulguard model # 544 custom ht. EE ELEV EE ELEV MTL EE ELEV EE ELEV MTL J2 H2 HM A HM 13/4 J2 H2 HM A HM 1 3/4" J5 H5 WD A 78) 2 1/4 Door & frame by insulguard model # 544 custom ht. wit wood veneer to match millwork Door & Frame by Insulguard mode! # ICDS full lite custom ht. A WD | | 2 1/4 J6 H6 WD A WD A 2 1/4 Door , frame and sidelite by Insulgard model #'s ICDS full lite and ICFW/1-3 side lite (custom) Door & frame by Insulguard mode! # 544 custom ht. with EMI shielding and wood veneer to match millwa Door & frame by Insulguard model # 544 custom ht. with EMI shielding and wood veneer to match millwa Wi CARD READE! RESISTANT LEVEL 17 3. DOOR & FRAME BY INSULGARD #544 CUSTOM HT.(FAIL SAFE LOCK) * Wi CARD READER/ po [LET RESISTANT LEVEL 7 3 (FAILSAFE LOCK ) ° 3 - [WICARD READER 3 WICARD READER 1 BY ACME BY ACME 5 WILIGHT SEALS /W DOOR CONTACT 8 / EMI SHIELD “ WICARD READER’ ROCLET RESISTART LEVEL 3 13A 18 YBOLLET RESISTANT LeveL 3 & Emi SHIELD 18 _- [BULLET RESISTANTLEVEL 3 & EMI SHIELD 11 1’ UNDERCUT NYC 9/11 Public Portal Document Office of Emergence Management, 5576A, WASS76\OEM Docs\Specs\ Door Schedule 2 19 98 xls DOOR-SC1 7 World Trade Center, New York, NY Printed 5/18/98 4:05 PM DOOR SCHEDULE meann 2 4 at

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173374Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗
Security system specification excerpt, May 1998 · Box 7DCAS

NYC-WTC_000173219

Technical specification document detailing end-of-line resistor wiring requirements for the Mayor's Office of Emergency Management security system.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.932

machine-extracted · confidence unavailable · Check page ↗
Addendum #1 to specifications, May 1998 · Box 7DCAS

NYC-WTC_000173205

Transmittal letter for Addendum #1 modifying project specifications and drawings for the Mayor's Office of Emergency Management at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.929

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

Similar indexed content

Compare copies and versions →