NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Door Schedule
Document / 9 pages

Door schedule specifications, Office of Emergency Management, 1998

Machine-extracted title · confidence 95%

Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.

NYC-WTC_000173210–000173218

Folder label: “Door Schedule

Page image
Scanned page image, NYC-WTC_000173214
OCR text

OCR status: ocr · source: ours

NYC-WTC_000173214 Office of Emergency Management 7 World Trade Center New York, New York 10048 SHCA Project No. 5576A SWANKE HAYDEN CONNELL ARCHITECTS * Revision #1, May 15, 1998 Addendum #1 Door Schedule Door Jamb Opening Frame Data Door Data UL Rating Hardware Remarks Floor Tag Width | Height | Jamb | Head | Material | Type | Material {si [th | cabet (Hrs) Set 4tA (2) 2'-6" 3-0 310 10 8) Cc wo 2 1/4 4 418 (2) 2'-6" 8'-0" J10 H10 WD c WD 214 4 41C (2) 2'-6" 8'-0' J10 H10 WD Cc wo 21/4 4 410 (2) 2'-6" 8'-0' J10 H10 WD Cc Wo 21/4 4 41E (2) 2'-6" 8'-0' J10 H10 wo Cc wo 21/4 4 42A 3-0" 8'-0" 410 H10 HM A HM 134 12 428 (2) 2'-6" 8-0 no H10 - Cc ; wo —_ 21/4 7 4 42C (2) 2'-6" 8'-0" J10 H10 c wo 2 1/4° 4 oO a -14/D- . MECHANICAL ROOM / W DOOR CONTACTS W/ 43 (2) 3-0 8'-0 J2 H2 HM c HM H-11/D-0 13/4 11/2 HR. 16 ASTRIGAL & SOUND SEAL =) 44 J 8-0" Jt Ht HM E HM/GL 144 12 44A 3-0" 8-0" Jt H1 HM A HM 13/4 3 WICARD READER 45 3'-0' 8'-0' J4 H4 HM Ee HMWG, 434 12 46 3-0" 8'-0' J H1 HM E HM/GL 14 12 Office of Emergence Management, 5576A, WAS576\0EM Docs\Specs\ Door Schedule 2 19 98 xls DOOR-SC1 DOOR SCHEDULE 7 World Trade Center, New York, NY Printed S/1B/9@ 4:05 PM Nanna fF osce NYC 9/11 Public Portal Document

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173214Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Addendum #1 to specifications, May 1998 · Box 7DCAS

NYC-WTC_000173205

Transmittal letter for Addendum #1 modifying project specifications and drawings for the Mayor's Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.902

machine-extracted · confidence unavailable · Check page ↗
RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.900

machine-extracted · confidence unavailable · Check page ↗
List of drawings Addendum #1, May 1998 · Box 7DCAS

NYC-WTC_000173192

List of architectural drawings issued under Addendum #1 for the Mayor's Office of Emergency Management project.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.890

machine-extracted · confidence unavailable · Check page ↗
RFI log for 7 WTC EOC project, July-August 1998 · Box 7DCAS

NYC-WTC_000173590

Request for Information log documenting responses to queries about wall offsets and dimensions at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.888

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

Similar indexed content

Compare copies and versions →