130 Cedar Street July 15, 2004 Carpentry
c. At steel stud partitions, attach wall anchors to studs with tapping screws. Spot grout anchors with USG Durabond Joint Compound just before board is inserted Into frame; coordinate with Section 09250. •
d. Place frames at fire-rated openings in accordance with NFPA Standard No. 80.
e. Make field splices in frames as detailed on final shop drawings, welded and finished to match factory work.
f. Remove spreader bars only after frames or bucks have been properly set and secured.
4. Door Installation: Fit hollow metal doors accurately in their respective frames, with the following clearances:
a. Jambs and Heads: 3/32".
b. Bottom: 1/4", where no threshold or carpet.
c. Place fire-rated doors with clearances as specified in NFPA Standard No. 80.
S. Wood Doors
1. Condition doors to average prevailing humidity in Installation area prior to hanging.
2. Install doors in accordance with Manufacturer's instructions.
3. Fit doors to frames and machine for hardware to whatever extent not previously worked at factory as required for proper fit and uniform clearance at each edge. [I 4. Clearances: For non-fire doors provide clearances of: 1/8" at jambs and heads; 1/8" at meeting stills for pairs of doors; and 1/2" from bottom of door to top of decorative floor finish or covering, except where threshold is shown or scheduled provide 1/4" clearance from bottom of door to top of threshold.
5. Fire-Rated Doors: Install in corresponding fire-rated frames in accordance with the requirements of NFPA No. 80. Provide clearances compliant with the limitations of the authority having jurisdiction.
C. Adjustments: Check and readjust operating finish hardware items just prior to final inspection. Leave work in complete and proper operating condition. Remove and replace defective work, including doors or frames which are warped, bowed or otherwise unacceptable.
3.04 BLOCKING AND MISCELLANEOUS WOOD
A. General:
1. Erect rough carpentry true to line, levels and dimensions required; squared, aligned, plumbed, and securely fastened in place.
•
NYC-WTC 000125196
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
Similarity score 0.932 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166810
Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.
Similarity score 0.929 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172426
Fax quote form from Insulgard Corporation for bullet-resisting door systems at the World Trade Center dated May 1998.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166810
Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.
Similarity score 0.926 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
Similarity score 0.924 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166810
Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.
Similarity score 0.924 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer