NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125146
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demottion and Façade Restoration Koenen Associates

2. Architect will prepare and issue a Certificate of Substantial Completion, containing:

a. Date of substantial completion. •

b. Punch list of items to be completed or corrected.

c. The time within which Contractor shall complete or correct work of listed items.

d. Date or time Owner will assume possession of work or designated portion thereof.

D. Contractor. Complete work listed for completion or correction, within designated time.

1.05 FINAL INSPECTION

A. Contractor shall submit written declaration to Owner and Architect that:

1. All aspects of Contract Documents have been complied with.

2. All items on substantial completion punch list have been completed.

3. All tools, construction equipment, and surplus materials have been removed from site.

B. The Owner, Architect and Contractor will make final inspection to ensure completion of all contract requirements.

C. When the Architect considers that work is finally complete In accordance with •

Contract Document requirements, the Architect will process close-out documents prior to issuance of final Certificate of Payment.

1.06 OPERATING AND MAINTENANCE INSTRUCTIONS

A. Three (3) bound sets of operating and maintenance instructions covering completely the operation and maintenance of all equipment furnished under the Contract shall be delivered to the Owner. These shall include operating sequence and flow diagrams of all systems. Three (3) sets lubricating charts of

and manuals for each item of equipment shall be furnished.

B. Upon completion of the work and at a time designated, a competent engineer shall be provided for a sufficient period to instruct representatives of the Owner In the operation and maintenance each piece of equipment and of equipment and of

of each system as a whole.

C. In addition, furnish to the Owner in three (3) sets of 8-which shall include, for each piece of operating equipment (electric or otherwise powered), the name, address, and telephone number of the firm or organization who are authorized by the manufacturer of the Installed equipment, to service and maintain the equipment as the need may arise within twenty-four (24) hours when summoned by the Owner.

1.07 PROJECT RECORD DOCUMENTS

Contract Close-Out 01700-2

NYC-WTC 000125146

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125146Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →