A. As the work progresses, keep a complete and accurate record of changes or
deviations from the Contract Documents and the shop drawings, indicating the
work as actually installed.
I. ,
1. Changes shall be neatly and correctly shown on the respective portions
of the affected document, using black line prints of the drawings affected,
or the specifications, with appropriate supplementary notes.
2. The records above shall be arranged in order, in accordance with the
various sections of the Specifications, and properly indexed.
3. This record set of drawings, shop drawings for inspection by the Architect
and Owner.
B. At the completion of the work, certify that each of the revised prints of the
drawings and Specifications is complete and accurate.
C. Prior to application for final payment, and as a condition to its approval by the
Architect and Owner, deliver the record drawings and specifications, arranged in
proper order, indexed, and certified as herein before specified. Provide suitable
transfer cases and deliver the records therein, Indexed and marked for each
division of the Work.
D. No review or receipt of such records by the Architect or Owner shall be a waiver
of any deviation from the Contract Documents or the shop drawings, or in any
way relieve the Contractor from his responsibility to perform the work in
accordance with the Contract Documents and the shop drawings to the extent
that they are in accordance with the Contract Documents.
1.08 GUARANTEES AND WARRANTIES
~i A. In addition to the Contractor's guarantees, warranties, service or maintenance
and similar contracts, where required by the Contract Documents, with direct
obligations running from the manufacturer to the Owner. Such guarantees or
warranties, as applicable, shall be subject to the approval of the Owner.
B. Guarantees. service policies and warranties for individual pieces of equipment or
portions of the work shall also date from final acceptance by the Architect, except
that where the Owner requests and obtains temporary use of such facilities prior
to final acceptance, the earlier date shall apply.
C. Certain guarantees longer than one year's duration are required under various
sections of these specifications. At the completion of the work all such
guarantees covering material, workmanship, maintenance, etc., as specified,
shall be produced by the Contractor, who shall forward them In duplicate to the
Architect together with a letter addressed to the Owner giving a summary of
guarantees attached, stating:
1. Character of Work.
2. Name of Contractor.
3. Period of Guaranty.
4. Condition of Guarantee.
• Contract Close-Out 01700-3
NYC-WTC 000125147