NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125148
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demoltion and Façade Restoration Koenen Associates

D. The guarantees shall cover any and all work done under this contract, either by the Contract Subcontractors. All guarantees shall bear the endorsement of Contractor in writing.

E. The correction of such work shall include without additional charge, all additional expenses, and damages In connection with such removal, replacement of any, or part, of the work which may be damaged or distributed thereby.

F. Form of Guarantee: The Contractor shall use the form found at the end of this Section for presentation of their guarantees.

1.09 KEYS AND MAINTENANCE KITS

A. All keys, maintenance kits or stock, replacement parts of materials, spare construction material, and equipment required under the contract shall be stored in the completed building in specific areas as designated by the Owner.

1.10 PROJECT CLOSE-OUT DOCUMENTATION

A. Prior to final payment, the Contractor shall submit to the Architect the following documents in an original and one copy unless otherwise noted:

1. A complete listing of all trade Subcontractors, business addresses and items supplied by such trade Subcontractor.

2. A listing of manufacturers of major materials, equipment and systems Installed In the work.

3. Payment of Debts and Claims and Consent of Surely: Adequate evidence that he has paid all obligations arising out of the Construction Contract. He shall submit AIA Document No. G-706, contractor's •

Affidavit of Payment of Debts and Claims, together with AIA Document G-707, Consent of Surety, Indicating written consent of the surety to final payment.

4. Release of Uens: Each Contractor shall also submit AIA Document G- 706-A, contractor's Affidavit of Release Uens, indicating that the release for waivers submitted are exceptions that they be so stated specifically in this form. Contractor and all Subcontractors and suppliers shall in addition submit any other release documentation required by the Owner.

5. Test Data: A copy of all test data taken.

6. All warranties, guarantees, maintenance agreements and similar provisions of the contract documents.

7. Final progress photographs.

8. A complete punch list signed off by General Contractor as being completed.

9. Operating and maintenance Instructions, keys, and maintenance kits.

10. Project record documents as described herein.

1.11 CERTIFICATE OF OCCUPANCY

Contract Close-Out 01700-4

NYC-WTC 000125148

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125148Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →