NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/LICENSE AGREEMENT
Document / 23 pages

Draft license agreement for 7 World Trade Center, July 1997

Machine-extracted title · confidence 95%

A twenty-three-page draft license agreement between the City of New York and 7 World Trade Company for office space at 7 World Trade Center.

NYC-WTC_000171051–000171073

Folder label: “LICENSE AGREEMENT

Page image
Scanned page image, NYC-WTC_000171059
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document (aFarMATo NoFenAcao IAfTite Amefores SETFAnTA Ia THo R. P.P. ITS approved Licensor's architect (the "Architect") and the proposed cost of bis services hereunder, Licensor shall cause its Architect to prepare architectural and engineering plans and specifications (the "Final Plans"). The Final Plans must be (i) engineering and architecturally complete; and (ii) coordinated with existing building conditions and facilities; and (iii) conform to all NYC codes and all other applicable requirements (including but not limited to terms and conditions in the professional services requirement document prepared by DRES, i.e., "Guide for Design Consultant"), (iv) elearty distinguish Licensor's Work from Licensee's Work and (v) coordinated cicosoos toRauh correl to konson and based on the Program Stmmary (attached hereto and made a part hereof as Exhibit "A"), in INFORMATION REFERENCED IN LICENSER'S ATPROMULETTER TO order to create a complete set of construction documents. The Final Plans must be filed by LICENSOR Licensor with the Building and Fire Departments and all other governmental authorities having jurisdiction. upon Within thirty (30) busirress days from DRES's written approval of Licensor's Architect, Licensor shall cause said Architect to arrange for preparation of initial Final Plans and delivery of same to DRES and the Buildings, Fire Department and other regulatory agencies which require said submission. Within five (5) business days DRES will review and either approve or disapprove the Final Plans. In the event DRES shall not approve such Final Plans it shall indicate in writing→ the corfections required before such approval can be fornished. Thereafter, Licensor shall resubmit revised Final Plans within five (5) business days and DRES shall approve or disapprove- such revised drawings and indicate whatever corrections it requires within five (5) business days after its receipt thereof; following which Licensor shall within five (5) business days af his receipt. Ai corrections required by DRES fully complete the revision of the Final Plans based on the—. requested corrections and furnish DRES with a complete set thereof for its approval. - 6- NYC-WTC 000171059

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171059Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

License agreement between City and 7 WTC Company · Box 7DCAS

NYC-WTC_000169388

A 30-page license agreement dated March 25, 1998, for the Mayor's Office of Emergency Management to occupy the 23rd floor at 7 World Trade Center.

9 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →