NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125127
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates

SECTION 01400

TESTING AND INSPECTION •

PART 1.00 - GENERAL

1.01 GENERAL REQUIREMENTS

A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents.

1.02 WORK INCLUDED

A. Work of this Section includes all labor, materials, equipment and services necessary to complete the testing and inspection requirements as specified herein.

1.03 RELATED WORK

A. Requirements for Testing and Inspection shall be described In various Sections of these Specifications. Where no testing and Inspection requirements are described but the Owner decides that it is required, the Owner may require additional testing and Inspection to be performed at his own expense.

B. Work Not Included

1. Unless otherwise noted in this Section or other Section of work, the Owner will select a pre-qualified independent testing laboratory and inspection professional.

2. Unless otherwise noted in this Section or other Sections of work, the Owner will • pay for all initial services of the testing laboratory and inspection professionals as further described in Article 2.01 of this Section of these Specifications.

1.04 QUALITY ASSURANCE

A. The testing laboratory will be qualified to the Owner's approval in accordance with ASTM E-329- 70 "Recommended Practice for Inspection and Testing Agencies for Concrete and Steel Used in Construction.

B. Testing, when required, will be in accordance with all pertinent codes and regulations and with selected standards of the American Society for Testing and Materials.

1.05 PRODUCT HANDLING

A. Promptly process and distribute all required copies of test reports and related instructions to ensure all necessary retesting and/or replacement of materials with the least possible delay in progress of the work.

PART 2.00 - PRODUCTS

2.01 PAYMENTS FOR TESTING AND INSPECTION SERVICES

A. Initial Services: The Owner will pay for all initial and inspection services.

B. Retesting; When initial tests and inspections Indicate non-compliance with local Codes and the Contract Documents, all subsequent retesting occasioned by the non-

S Testing and Inspection 01400-1

NYC-WTC 000125127

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125127Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →