NYC-WTC_000125098–000125202Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates
compliance shall be performed by the same testing laboratory and inspectors and the costs thereof will be deducted by the Owner from the Contract Sum. 0 2.02 CODE COMPLIANCE TESTING AND INSPECTION
A. Inspections and tests required by all applicable Codes or Ordinances shall be paid by for by the Owner unless otherwise noted in this Section or other Sections of work. Retesting or inspection as required shall conform to the requirements of Article 2.01B of this Section.
2.03 CONTRACTOR'S TESTING
A. Inspection or testing performed exclusively for the Contractor's convenience shall be the sole responsibility of the Contractor.
B. Where operating tests are specified, the Contractor shall test his work as it progresses, on his own account, and shall make satisfactory preliminary tests in all cases before applying for official tests.
C. Tests shall be made in the manner specified, for the different branches of the work. Each test shall be made on the entire system for which such test Is required, wherever practical. In case it is necessary to test portions of the work independently, the Contractor shall do so without extra compensation. The Contractor shall furnish all labor, material and apparatus, make connections and conduct the official test. The test will be conducted In the presence of a representative of the Architect.
D. All parts of the mechanical and electrical work and associated equipment shall be tested and adjusted to work properly and be left in perfect operating condition. All defects disclosed by these tests shall be corrected to the satisfaction of the Architect and Engineer without any additional cost to the Owner. Tests shall be repeated on this repaired or replaced work if deemed necessary by the Architect. The Architect shall be notified at least forty-eight (48) hours in advance of all tests, and shall be represented at tests that he deems necessary. The Contractor shall furnish all necessary instruments, other equipment, and personnel required for such tests.
E. Required certificates of inspection, testing or approval shall be secured by the contractor and promptly delivered by him to the Architect.
F. If the Architect or Engineer is to observe the inspections, test or approvals required by the Contract Documents, he will endeavor to do so promptly and, where practicable, at the source of supply.
PART 3.00 - EXECUTION
3.01 COOPERATION WITH TESTING LABORATORY AND INSPECTORS
A. Representatives of the testing laboratory and inspections shall have access to the work at all times. Provide facilities for such access in order that they may properly perform their functions.
3.02 SCHEDULES
A. Establishing Schedule
Testing and Inspection 01400-2
NYC-WTC 000125128
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.935 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Similarity score 0.933 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126593
Document outlining minimum contractor requirements for asbestos abatement work at 100 Church Street.
Similarity score 0.932 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similarity score 0.932 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
Similarity score 0.931 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer