130 Cedar Street July 15, 2004
Selective Demolition and Façade Restoration Koenen Associates
17. The Contractor shall submit one copy of each standard referred to in the
Specifications (ASTM, Fed. Spec., etc.) with the submission of each respective
shop drawing, sample, or literature.
•
B. Submission of Shop Drawings
1. Architectural Work: Submit one (1) sepia reproducible and three (3) black line of
each shop drawing to the Architect for approval. If approved, the Architect will
return one (1) sepia stamped "No Exceptions Taken" or "Make Corrections
Noted", and the Contractor shall print the required number of copies. In the event
the Architect returns one (1) sepia stamped "Revise and Resubmit' or "Rejected",
the Contractor shall make indicated changes and resubmit one (1) sepia
reproducible and two (2) black line prints to the Architect.
2. Structural work and Mechanical Work: Submit one (1) sepia reproducible and
three (3) black line prints of each shop drawing to the Engineer, with one (1) black
line print (for first submission only) and copy of the transmittal to the Architect. If
Accepted, the Engineer shall return one (1) sepia stamped "In General
Conformance With Design Concept" or "in General Conformance With Design
Concept Except As, and the Contractor shall print the required number of copies.
In the event the Architect returns one (1 sepia stamped "Revise and Resubmit' or
"Rejected", the Contractor shall make indicated changes and resubmit one (1 )
sepia reproducible and two (2) black line prints to the Engineer, with a copy of the
Transmittal form to the Architect.
3. Prints: The Contractor shall provide all prints or shop drawings as reasonably
required by subcontractors, material suppliers, superintendents, inspectors, and
others as required for the work, or as directed by the Architect. The Contractor
shall pay all costs in connection with printing and distribution of shop drawings.
•
C. Submission of Manufacturer's Literature, including Catalog, Catalog Cuts, Brochures,
Charts, Test Data and Similar Information
1. Manufacturer's literature will receive consideration only when accompanied by the
transmittal form properly filled out, as indicated, and listing each item of literature,
as well as the Specification Section and paragraph numbers describing such
materials. Any deviations from contract requirements shall be stated on the
above form or attached to it.
2. Architectural Work: Submit six (6) copies of Manufacturer's literature to the
Architect for acceptance. If accepted, the Architect will return four (4) copies
stamped "No Exceptions Taken" or "Make Corrections Noted". In the event the
Architect returns the literature stamped "Revise and Resubmit" or "Rejected", he
will return two (2) copies only. The Contractor shall resubmit six (6) copies of
correct or corrected literature of all submissions stamped "Revise and Resubmit"
or "Rejected", with one (1) copy of correct or corrected literature with copy of the
transmittal form to the Architect.
3. Structural Work and Mechanical Work: Submit six (6) copies of Manufacturer's
literature to the Engineer, with one (1) copy of the literature and copy of the
transmittal form to the Architect. If accepted, the Architect will return four (4)
copies stamped "In General Conformance With Design Concept" or "In General
Conformance With Design Concept Except As Noted". In the event the Architect
stamps the literature "Revise and Resubmit' or "Rejected", he will return two (2)
copies only. The Contractor shall resubmit six (6) copies of correct or corrected
literature to the Engineer for all submissions stamped "Revise and Resubmit" or
•
Submittals 01300-4
NYC-WTC 000125121