6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Change orders for rooftop contracts, September 2002
Machine-extracted title · confidence 70%Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
NYC-WTC_000163514–000163517Folder label: “E-mails M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Hi DEPForm409N = CONTRACT AND CONTRACT CHANGE NUMBER Rooftop/Facade Remediation in Vicinity of WTC C.0.1
COMPTROLLER'S REGISTRATION NUMBER CT 826 20020015798 I------------ BUDGET LINE CONTRACT ID and DESCRIPTION B.C. W005/OBJ 600 ROF-REM3Emergency Rooftop/Facade Remediation In Vicinity of WTC Site
CONTRACTOR'S NAME AND ADDRESS PIN FMS PROJECT ID Trio Asbestos Removal Corp., 14-20 129^ Street, College Point, NY 11356 826WTCROOF03 826L
CONTRACT AWARD AMOUNT DESIGN FIRM (If applicable)
$1,005,650 % ITEM DESCRIPTION OF WORK CONTRACTOR'S AUTHORIZED NUMBER ATTACH ADDITIONAL SHEETS IF NECESSARY PROPOSAL COST This change order is being advanced pursuant to the Declaration of Emergency signed by former Commissioner Joel Miele on March 20, 2002. On April 2,2002, written approval was provided by the Comptroller and by the Corporation Counsel.
1 Remediation of additional building roofs, setbacks and/or building facades is required within the vicinity of the World Trade Center under the same terms and conditions set forth in the contract. The additional remediation is estimated to be: $1,130,399 $$1,130,399 434,769 sq. ft. Facade Cleaning @$2.60 each $ 753,600 $ 753,600 753,600 sq. ft. Roof Asphalt/Uncovered Surface @$1.00 each $ 627,974 $ 627,974 228,354 sq. ft. Roof GravelZStone Surface @ $2.75 each
The end date of this contract is changed from September 25, 2002 to November 29,2002, an extension not to exceed 66 days.
TOTALS |nterim(if any) or Forced (if any) PLUS Final (if any) or $2,511,973 $2,511,973 Revised (if any) otherwise TOTAL = This Change Order PREVIOUS AMOUNT REGISTERED FOR THIS CHANGE (If any) $0
AMOUNT REQUIRED FOR REGISTRATION OF THIS CHANGE $2,511,973 1. The Contractor shall sign 4 copies of this form, and together with 4 copies of the Contractor's detailed cost proposal, send it to the Agency Contact for this Contract within seven calendar days of receipt of this proposed contract change.
2. If the total amount of the extra work (excluding credit change orders) Issued for the contract exceeds 10% of the contract amount or $100,000, whichever Is greater, or exceeds previous BOE/ODC/MOC Approvals, the Agency must obtain approval from the Mayor's Office of Construction or the Mayor’s Office of Contracts (as applicable) In order to award extra work.
3. When a price Is agreed to between the Commissioner's authorized representative and the Contractor, and all required approvals have been obtained, the Contractor shall be Issued a contract change to proceed with the work. Contractor shall not proceed with this work until Issued contract change or otherwise directed by the Commissioner.
4. Any payments for extra work must be requisitioned separately from payments for work required under the original contract
5. All Construction and Construction-Related work is subject to post-audit by the Department's Engineering Audit Offioer and the Comptroller's Chief Engineer.____________________ ____________________ _____________________________________________________________
1) CONTRACTOR'S APPROVAL 3) DEPARTMENTS APPROVAL
Submitted above is my Cost Proposal for the Contract This Change is approved and the contractor/consultant is Change. Contractor hereby certifies that the cost and directed to proceed. Payment will be made as provided pricing data submitted are accurate, complete and herein. current. [ ] On a Time and Material Basis Not-to-Exceed the Authorized Contractor's Signature Cost [ ] On a Unit Price Basis Not-to-Exceed the Authorized Cost [ ] At the Authorized Cost Title Date: ssss Authorized Signature 2) CONTRACTOR AGREES WITH "AUTHORIZED COST" Contractor's Signature Title: Date:
Title Date:
Rev 11/24/00 DEPFM409N
NYC-WTC_000163517
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000163040
Draft change order for WTC cleaning contracts establishing unit prices for HVAC cleaning without increasing contract NTE price.
3 shared non-person entities · Same agency, volume and box · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000135164
DEP contract change form for the monitoring of apartments in the vicinity of the World Trade Center site dated 2003.
4 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135336
Letter regarding instructions to install construction paper for carpet removal at 310 Greenwich Street.
6 shared non-person entities · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153563
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
1 shared non-person entities · 1 shared topics · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168193
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, listing TAA application forms and riders.
1 shared non-person entities · 1 shared topics · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168166
Fax cover sheet from Milo Kleinberg Design Associates dated July 17, 1997, regarding WTC/PA TAA application forms.
1 shared non-person entities · 1 shared topics · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118359
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
2 shared non-person entities · 1 shared topics · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
1 shared non-person entities · 1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118384
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
2 shared non-person entities · 1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123068
Letter from DEP notifying the owner of 189 Broadway that exterior surveys identified visible World Trade Center debris on the property.
2 shared non-person entities · 1 shared topics · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000163228
Official notice instructing staff to preserve scanned World Trade Center documents as potential evidence in future legal actions.
Filed in the same folder
NYC-WTC_000163229
Official directive instructing staff to retain specific scanned WTC documents as evidence for potential future litigation against the City.
Filed in the same folder
NYC-WTC_000163231
Interdepartmental comments from NYCDOH and NYSDOH on draft Statements of Work for WTC contracts.
Filed in the same folder
NYC-WTC_000163234
EPA correspondence clarifying regulatory agency roles, asserting NYC Department of Health holds primary authority for mold remediation in WTC recovery.
Filed in the same folder
NYC-WTC_000163238
EPA transmission of finalized Scopes of Work for indoor dust cleaning and environmental monitoring components of recovery program.
Filed in the same folder