NYC 9/11 Public Portal Document
Hi DEPForm409N
CONTRACT AND CONTRACT CHANGE NUMBER
vHj
Rooftop/Facade Remediation in Vicinity of WTC C.0.1
COMPTROLLER'S REGiSTRATiON NUMBER
CT 826 20020015275
BUDGET LINE CONTRACT iD and DESCRIPTION
B.C. W005/OBJ 600 ROF-REM1 Emergency Rooftop/Facade Remediation In Vicinity of WTC Site
CONTRACTOR'S NAME AND ADDRESS PIN FMS PROJECT ID
Fiber Control, Inc., 3010 Bums Avenue, Wantagh, NY 11793 826WrCROOF01 826L
CONTRACT AWARD AMOUNT DESIGN FIRM (If applicable)
$ 1,352,337.50 %
ITEM DESCRIPTION OF WORK CONTRACTOR'S AUTHORIZED
NUMBER ATTACH ADDITIONAL SHEETS IF NECESSARY PROPOSAL COST
This change order is being advanced pursuant to the
Declaration of Emergency signed by former Commissioner Joel
Miele on March 20, 2002. On April 2,2002, written approval was
provided by the Comptroller and by the Corporation Counsel.
1
Remediation of additional building roofs, setbacks and/or
building facades is required within the vicinity of the World
Trade Center under the same terms and conditions set forth in
the contract. The additional remediation is estimated to be: $ 670,684 $ 670,684
268,273 sq. ft. Facade Cleaning @$2.50 each $ 447,121 $ 447,121
302,109 sq. ft Roof Asphalt/Uncovered Surface @ $1.48 each $ 372,601 $ 372,601
125,034 sq. ft. of gravel/stone surface at $2.98 each
The end date of this contract is changed from September 12,
2002 to November 29, 2002, an extension not to exceed 79 days.
TOTAL® lnterim(if any) or Forced (if any) PLUS Final (If any) or $1,490,406 $1,490,406
Revised (if any) otherwise TOTAL ® This Change Order
PREVIOUS AMOUNT REGISTERED FOR THIS CHANGE (if any) $0
AMOUNT REQUIRED FOR REGISTRATION OF THIS CHANGE $1,490,406
1. The Contractor shall sign 4 copies of this form, and together with 4 copies of the Contractor's detailed cost proposal, send It to the Agency
Contact for this Contract within seven calendar days of receipt of this proposed contract change.
2. If the total amount of the extra work (excluding credit change orders) Issued for the contract exceeds 10% of the contract amount or $100,000,
whichever Is greater, or exceeds previous BOE/ODC/MOC Approvals, the Agency must obtain approval from the Mayor's Office of Construction
or the Mayor's Office of Contracts (as applicable) in order to award extra work.
3. When a price is agreed to between the Commissioner's authorized representative and the Contractor, and all required approvals have been
obtained, the Contractor shall be Issued a contract change to proceed with the work. Contractor shall not proceed with this work until issued a
contract change or otherwise directed by the Commissioner.
4. /Vny payments for extra work must be requisitioned separately from payments for work required under the original contract
5. All Construction and Construction-Related work Is subject to post-audit by the Department's Engineering Audit Officer and the Comptroller's
Chief Engineer._____________________________________________________________________________________________________
1) CONTRACTOR'S APPROVAL 3) DEPARTMENTS APPROVAL
Submitted above is my Cost Proposal for the Contract This Change is approved and the contractor/consultant is
Change. Contractor hereby certifies that the cost and directed to proceed. Payment will be made as provided
pricing data submitted are accurate, complete and herein.
current.
[ ] On a Time and Material Basis Not-to-Exceed the Authorized
Contractor's Signature Cost
[ ] On a Unit Price Basis Not-to-Exceed the Authorized Cost
[ ] At the Authorized Cost
Title Date:
Authorized Signature
2) CONTRACTOR AGREES WITH “AUTHORIZED COST"
Contractor's Signature
Title: Date:
Title Date: