NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
5 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Correspondence or record related to asbestos removal activities at the World Trade Center site.
NYC-WTC_000133965–000133974Folder label: “B Cole JBH”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
, COT AC'T CHANGE DEP Form 409N
CONTRACT AND CONTRACT CHANGE NUMBER i 1 WTC Indoor Dust Cleaning Program C.O. 1
.ca?` COMPTROLLER'S REGISTRATION NUMBER l 'HF\iAl fflOZ...
CT 826 20030010736
BUDGET LINE CONTRACT ID and DESCRIPTION B.C. W005108J 600 WTC-AMB Monitoring of Apts in Vicinity of WTC4
CONTRACTOR'S NAME AND ADDRESS PIN FMS PROJECT ID Cole Consulting Corp., 2269 Saw Mill River Road. Elmsford, NY 10523 82603WTCIAMB 826 NAJ _
CONTRACT AWARD AMOUNT DESIGN FIRM (if applicable)
$2,358,375 ITEM DESCRIPTION OF WORK CONTRACTOR'S AUTHORIZED NUMBER ATTACH ADDITIONAL SHEETS IF NECESSARY PROPOSAL COST
This change order is being advanced pursuant to the Declaration of Emergency signed by Commissioner Christopher 0. Ward on May 7. 2002. On May 13, 2002, written approval was provided by the Corporation Counsel, and on May 28, 2002 written approval was provided by the Comptroller.
This Change Order shall provide an administrative fee of $97.50 per apartment, an amount equal to 3 hours of Project Monitor $160,875 $160,875 time, under the same terms and conditions of the contract. This fee is limited to a maximum of 1650 apartments. The contractor shall comply with the cancellation policy implemented by USEPA on November 26, 2002, and shall confirm appointments 24 hours in advance.
TOTAL= Inferim,(if r,) or eJ (if ar.yi NLUS Final (if any) or $160,875 $160,875 Revised (if any) otherwise TOTAL = This Change Order PREVIOUS AMOUNT REGISTERED FOR THIS CHANGE (if any) $0 AMOUNT REQUIRED FOR REGISTRATION OF THIS CHANGE $160,875 t. The Contractor shall sign 4 copies of this form, and together with 4 copies of the Contractor's detailed cost proposal, send It to the Agency Contact for this Contract within seven calendar days of receipt of this proposed contract change.
2. If the total amount of the extra work (excluding credit change orders) issued for the contract exceeds 10% of the contract amount or $100,000, whichever is greater, or exceeds previous BOEIODC/MOC Approvals, the Agency must obtain approval from the Mayor's Office of Construction or the Mayor's Office of Contracts (as applicable) In order to award extra work.
3. When a price Is agreed to between the Commissioner's authorized representative and the Contractor, and all required approvals have been obtained, the Contractor shall be issued a contract change to proceed with the work. Contractor shalt not proceed with this work until issued a contract change or otherwise directed by e Commissioner.
4. Any payments for extra work must be requisitioned separately from payments for work required under the original contract,
5. All Construction and Construction -Related work is subject to post-audit by the Department's Engineering Audit Officer and the Comptroller's Chief En ineer.
1) CONTRACTOR'S APPROVAL 3) DEPARTMENT'S APPROVAL
Submitted above is my Cost Proposal for the This Change is approved and the contractor/consultant is ContractChange.Con ractort .ertifiesthatthe directed to proceed. Payment will be made as provided cost and cing a s tted are accurate, herein. complete curr t. [ j On a Time and Material Basis Not-to-Exceed the Authorized Contract r' i Ina 'U Cost [ On a Unit Price Basis Not-to-Exceed the Authorized Cost i M At the Authorized Cost Title_________ lT Date: Authorized Signature 2) CONTRA ' RAG S WI " THO IZED COST,' ( y~ ~} A^~
Contracto I igrla r Title: . Date:_______
Title p@ZSibFn*r Date: -4 29 O
Rev 11,24/00 DEP FM 409N
NYC-WTC 000133970
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
5 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127695
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
2 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127657
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
2 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
5 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135975
Document containing illegible text or corrupted data within the Department of Environmental Protection's Athena D Terms records.
8 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117514
Chain of custody form accompanying a November 2001 assessment and bulk sampling report for Building #400 at 375 South End Avenue.
5 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142561
Fax transmission confirmation report from DEP dated March 15, 2002.
2 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130855
Invoice from Asbestos Removal Corp for roof cleanup services at 40 Exchange Place dated September 18, 2002.
5 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108177
Single-page document containing identification codes and file references for World Trade Center environmental records at 120 Liberty Street.
6 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000101404
Transmittal letter from ETS Contracting to DEP submitting close-out documentation for 114 Liberty Street dated April 21, 2003.
6 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114261
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos abatement and cleanup at 12 Platt Street.
4 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000135336
Letter regarding instructions to install construction paper for carpet removal at 310 Greenwich Street.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135975
Document containing illegible text or corrupted data within the Department of Environmental Protection's Athena D Terms records.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135164
DEP contract change form for the monitoring of apartments in the vicinity of the World Trade Center site dated 2003.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.972 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000133964
A single-page document fragment from the Cole JBH folder containing illegible text and a project identification number.
Filed in the same folder
NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
Similar indexed content
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similar indexed content
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similar indexed content
Similar indexed content