Demolition schedule and site plan notes, 130 Cedar Street

Machine-extracted title · confidence 98%

General notes and requirements for demolition work at 130 Cedar Street including contractor qualifications.

NYC-WTC_000125073–000125075

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125073
OCR text

OCR status: ocr · source: ours

Nyeawre_go0125073, 130 CEDAR STREET GENERAL NOTES DEMOLITION SCHEDULE SITE PLAN comply with opplicable local and ng codes, as well os any ond all tory agencies, including, but not limited General Notes shall apply to all drawings i prior to pricing or es shall be notified of ony ncies -or omissions which would interfere tisfactory completion of the work, prior to the start of ony end all work 4. The Contractor shall hove had experience on ot leost three projects involving qualities ond complexities ot least equ se require under all divisions detailed in these drawings. All workmen performing under this work shall be skilled workmen in their respective trodes. 5. All work, whether shown or implied, be responsible for ony misinterpretotions or consequences thereof for al work on all drowings. 6, The Contractor shall review a 9 Department offices ond poy all outstanding fees sCenstrvction Manager shall provide ob the ings, completed paperwork, and certificates of Inspection ond shell perform all the nspec ions as requi Building on completion of the ji Manager shall submit certificates tificate of substonti Document #6-704) proceed is returned to the Construction. Manager. 11. The Owner reserves the right to let other contracts in connection with the work of the project. The responsile for coordination of work ond 2. Contractor shall schedule oll work to conform onstruction Schedule and shal as approved by the be sceled; dimensions 14. All work is to conform to KA drawings ond specificetions and shal of the kind specified, existing to be reused 15, Edch Contractor is to maintain ¢ compl and ua—to-date set of drawings on the job times, ,including Contract Documents and Shop Drawings 16. No mat will consider dividual basis. t ond cuts for written opproval by KA stort of ony work Sontractors’ shop drawings shal to KA for approval through t performed, uniess otherwise noted. 20. The Contractor shall be responsible for ‘arranging with Construction Monager the use of elevator or other hoisting facilities for handling the 3 regarding elevator cob size, door fees involved for the use be the responsibility of the Construction Manager 21. Egress routes ond fire stairs shall be kept clear at all times. 1 Manager shall meintain ond field office telephone ond fax the course of 23. Workmen will be assigned one toilet oreo which the Generel Contractor will be responsible for clearing, maintoiring, and. upon competion work, re: original cone 24. Construction personnel must corry proper identification at cil times, ll ladders and scaffolding shail be in good g condition. All damaged ladders, bakers, ond rolling scaffolding shall be immediately removed job site 26. All windows shall be kept closed in the work oreos 27. Fire extinguishers must be kept on the job site during construction ‘ond the areas involved materials, 29. Construction Monager INTERIOR NON-BEARING PARTITIONS AS INDICATED ON THE CONTRAC RAWINGS INCLUDING. NOT LIMITED TO: ELEVATOR SHAFT ENCLOSURES, STAIRWAY #1 ENCLOSURE, RESTROOM WALLS 5. PLUMBING FIXTURES AND RELATED PIPING. 6. ELECTRIC SWITCH EARS AND PANELS IN BASEMENT 7. STEAM PIPES AND PERIMETER RADIATORS. 8. EXTERIOR BRICK PARAPETS AND FACE BRICKS FROM CONCRETE PARAPETS 9. ALUMINUM WINDOWS AND FRAMES ON THE-NORTH AND SOUTH FACADES (SEE JCL ABATEMENT PACKAGE FOR STEEL CASEMENT WINDOWS AND STEEL 0. EXTERIOR MASONRY SPANDREL PANELS AND NON-BEARI MULLIONS. ROOFTOP BULKHEAD ENC! WAY #2, SURES AND CONCRETE STRUCTL 12. EXTERIOR CONCRETE FACADE PANELS ON 13. NORTH-END OF MAIN ROOF SLAB AND CONCRETE PARAPET BACKUP AS INDICATED ON CONTRACT dRAWINGS. ONGRETE COLUMNS ANO MASONRY WALLS DI ROOF ‘SUA TO G= REMOVED. DOWN FO. THE EXTERIOR MASONRY PILASTERS & SHELF At 530 CEDAR STRI NEW YORK, NEW YORK BUILDING DEPARTMENT NOTES ‘ond remove from the pret rubbish, EXISTING TO REMAIN 30, The Construction Mo for ail costs incurred for Subcontractors. coused by his structural shoring to remain; protect 1, Building is to be examined under Old Code. 2, Building is Class 1 Fireproof Construction 3. Existing CO: compi protection or egress. Items subject to cdntrolled inspection: None All work shall comply with NYCDOB requirements, rules, o s; no chonge to use, occupancy, STAIRS, RAILINGS, & ae ZONING DATA ELEVATOR CAR, EQUIPMENT & ENCLOSURE ZONING DISTRICT: 6-9, LOWER MANHATTAN SPECIAL DISTRICT 32. Each Contractor shell have 0 competent the premises at oll times when Seceoe ZONING MAP new shoring required for demolition to be designed by licensed engineer. Signed and sealed shop drawings to be submitted for approval E JLC ABATEMENT CONTRACT DRAWINGS AND SPE DINATION AND EXTENT OF ABATEMENT WORK CATION FOR SHELF ANGLES AT_EX SRECE ANGLE LOCATIONS REPAIR OF ALL 4. INSTALLATION OF SEMI-PERMANENT WATERPROOFING ENCLOSURES AT ROOF hd see any LX wore eevisen roe constr cunn oA sue | te I revier 130 CEDAR STREET NEW YORK, NEW YORK SELECTIVE DEMOLITION & FACADE RESTORATION owner CEDAR & WASHINGTON STREET ASSOCIATES, LLC ARCHITECT STRUCTURAL ENGINEERS: SEVERUD ASSOCIATES DRAWING LIST SIGN & SEAL CONSULTING ENGINEERS PC, 38 Est 29 Strst New York, New York Tet 2129%6-3700 MEP.eF ENGINEERS: LORING CONSULTING ENGINEERS D1-2 EXTERIOR FACADE DEMOLITION 1 Pen Pica NEW Yu New Yo 101 AND RESTORATION DRAWINGS ists 7408 Fax: 212/565-7382 “SELECTIVE DEMOLITION & FACADE RESTORATION TITLE PAGE TYPE-WRITTEN SPECIFICATION IS PART OF CONTRACT DOCUMENTS NYC9711 Public Petal Document

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125073Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →