130 CEDAR STREET
GENERAL NOTES
DEMOLITION SCHEDULE
SITE PLAN
comply with opplicable local and
ng codes, as well os any ond all
tory agencies, including, but not limited
General Notes shall apply to all drawings
i prior to pricing or
es shall be notified of ony
ncies -or omissions which would interfere
tisfactory completion of the work, prior
to the start of ony end all work
4. The Contractor shall hove had experience on ot
leost three projects involving qualities ond
complexities ot least equ se require
under all divisions detailed in these drawings. All
workmen performing under this work shall be
skilled workmen in their respective trodes.
5. All work, whether shown or implied,
be responsible for ony
misinterpretotions or consequences thereof for al
work on all drowings.
6, The Contractor shall review a
9
Department offices ond poy all outstanding fees
sCenstrvction Manager shall provide ob the
ings, completed paperwork, and certificates of
Inspection ond shell perform all the
nspec ions as requi Building
on completion of the ji
Manager shall submit certificates
tificate of substonti
Document #6-704)
proceed is returned to the Construction. Manager.
11. The Owner reserves the right to let other
contracts in connection with the work of the
project. The
responsile for coordination of work ond
2. Contractor shall schedule oll work to conform
onstruction Schedule and shal
as approved by the
be sceled; dimensions
14. All work is to conform to KA drawings ond
specificetions and shal
of the kind specified,
existing to be reused
15, Edch Contractor is to maintain ¢ compl
and ua—to-date set of drawings on the job
times, ,including Contract Documents and Shop
Drawings
16. No mat
will consider
dividual basis. t
ond cuts for written opproval by KA
stort of ony work
Sontractors’ shop drawings shal
to KA for approval through t
performed, uniess otherwise noted.
20. The Contractor shall be responsible for
‘arranging with Construction Monager the use of
elevator or other hoisting facilities for handling the
3 regarding elevator cob size, door
fees involved for the use
be the responsibility of
the Construction Manager
21. Egress routes ond fire stairs shall be kept
clear at all times.
1 Manager shall meintain ond
field office telephone ond fax
the course of
23. Workmen will be assigned one toilet oreo which
the Generel Contractor will be responsible for
clearing, maintoiring, and. upon competion
work, re: original cone
24. Construction personnel must corry proper
identification at cil times,
ll ladders and scaffolding shail be in good
g condition. All damaged ladders, bakers,
ond rolling scaffolding shall be immediately removed
job site
26. All windows shall be kept closed in the work
oreos
27. Fire extinguishers must be kept on the job site
during construction
‘ond the areas involved
materials,
29. Construction Monager
INTERIOR NON-BEARING PARTITIONS AS INDICATED ON THE CONTRAC
RAWINGS INCLUDING. NOT LIMITED TO: ELEVATOR SHAFT ENCLOSURES,
STAIRWAY #1 ENCLOSURE, RESTROOM WALLS
5. PLUMBING FIXTURES AND RELATED PIPING.
6. ELECTRIC SWITCH
EARS AND PANELS IN BASEMENT
7. STEAM PIPES AND PERIMETER RADIATORS.
8. EXTERIOR BRICK PARAPETS AND FACE BRICKS FROM CONCRETE PARAPETS
9. ALUMINUM WINDOWS AND FRAMES ON THE-NORTH AND SOUTH FACADES
(SEE JCL ABATEMENT PACKAGE FOR STEEL CASEMENT WINDOWS AND STEEL
0. EXTERIOR MASONRY SPANDREL PANELS AND NON-BEARI
MULLIONS.
ROOFTOP BULKHEAD ENC!
WAY #2,
SURES AND CONCRETE STRUCTL
12. EXTERIOR CONCRETE FACADE PANELS ON
13. NORTH-END OF MAIN ROOF SLAB AND CONCRETE PARAPET BACKUP AS
INDICATED ON CONTRACT dRAWINGS.
ONGRETE COLUMNS ANO MASONRY WALLS DI
ROOF ‘SUA TO G= REMOVED. DOWN FO. THE
EXTERIOR MASONRY PILASTERS & SHELF At
530 CEDAR STRI
NEW YORK, NEW YORK
BUILDING DEPARTMENT NOTES
‘ond remove from the pret
rubbish,
EXISTING TO REMAIN
30, The Construction Mo
for ail costs incurred for
Subcontractors.
coused by his
structural shoring to remain; protect
1, Building is to be examined under Old Code.
2, Building is Class 1 Fireproof Construction
3. Existing CO: compi
protection or egress.
Items subject to cdntrolled inspection: None
All work shall comply with NYCDOB requirements, rules, o
s; no chonge to use, occupancy,
STAIRS, RAILINGS, &
ae
ZONING DATA
ELEVATOR CAR, EQUIPMENT & ENCLOSURE
ZONING DISTRICT: 6-9, LOWER MANHATTAN SPECIAL DISTRICT
32. Each Contractor shell have 0 competent
the premises at oll times when
Seceoe
ZONING MAP
new shoring required for demolition to be
designed by licensed engineer. Signed and sealed
shop drawings to be submitted for approval
E JLC ABATEMENT CONTRACT DRAWINGS AND SPE
DINATION AND EXTENT OF ABATEMENT WORK
CATION FOR
SHELF ANGLES AT_EX
SRECE ANGLE LOCATIONS
REPAIR OF ALL
4. INSTALLATION OF SEMI-PERMANENT WATERPROOFING ENCLOSURES AT ROOF
hd
see any
LX wore eevisen roe constr cunn oA
sue | te I revier
130 CEDAR STREET
NEW YORK, NEW YORK
SELECTIVE DEMOLITION
& FACADE RESTORATION
owner
CEDAR & WASHINGTON STREET
ASSOCIATES, LLC
ARCHITECT
STRUCTURAL ENGINEERS:
SEVERUD ASSOCIATES
DRAWING LIST SIGN & SEAL CONSULTING ENGINEERS PC,
38 Est 29 Strst New York, New York
Tet 2129%6-3700
MEP.eF ENGINEERS:
LORING
CONSULTING ENGINEERS
D1-2 EXTERIOR FACADE DEMOLITION 1 Pen Pica NEW Yu New Yo 101
AND RESTORATION DRAWINGS ists 7408 Fax: 212/565-7382
“SELECTIVE DEMOLITION
& FACADE RESTORATION
TITLE PAGE
TYPE-WRITTEN SPECIFICATION IS
PART OF CONTRACT DOCUMENTS
NYC9711 Public Petal Document