Demolition schedule and general notes, 30 Cedar Street

Machine-extracted title · confidence 95%

Contractor requirements and site plan notes for demolition work at 30 Cedar Street.

NYC-WTC_000125070–000125072

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125070
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document 30 CEDAR STREET GENERAL NOTES DEMOLITION SCHEDULE SITE PLAN 1, All work shall comply with applicable local and ‘any and all 3, The Contractor shall verify ali job conditions, dimensions ond details prior to construction, ond red prior to pricing Bidding, Koenen Associates shall be notified of ny eponcies or omissions which would inter Gitr the actsfoctory completion of the Work, prior to the start of any and all work. 4, The Contractor shall have had experience on at involving qualities and under all divisions workmen performing unc “elisa worurnen in the respective. trodes AMI work, whether shown, or imptied. unless nall be considered fully resi consequences thereof for all wark on all drawings. 6, The Contractor shall revi himself with the dug. ond dateripn winch notes apply. directly to his responsibilit ich subtrade will be responsible for reviewing the entire set of drawings and noting their work as applicable. Al labor, materials, equipment, etc. required for the work os indicoted erred on the drawings be deemed ond included ‘in all Contractors’ cos and famiirize oles & Specificat 7. Construction Monager shall be r pensib to pick up the building permit ot, the Buildin Department offices and pay all outstend ag foes 8. Construction Manager shall provide all the drawings, completed paperwork, and certific inspection and shall perform all the controlled inspections as required for Building Department approval. es of 9. Upon completion of the job, the Construction Manager shall submit certificates of inspection and © certificate of substontiol completion (A.A Document $#6-704) 40. The Construction Manager shall submit in writing oll proposals for additional work to the 's office for review and aj ‘a signed authorization to 1e Construction Manager. project, The Construction Manager” shal responsible for coordination of work and establishing schedules for oll trades; he shol wer Contractors reasonable opportunity the introduction and storoge of their materials equipment and the execution of their work 12. Contractor, shel schedule all work to conform ral Construction Senedule ‘and shalt Cooperate withthe ctors in the required Architect. 13. Drawings are not to be scaled; dimensions govern. form to KA drawings and specifications ond shall be new and best quality of the kind specified, unless spe: noted for existing to be reused 15. Each Contractor is to maintain o complete ond up-tocdete set of drowings on the job at all including Contract Documents and Shop times, 16. No materiol substitutions shall be mode. KA and cuts for written opproval by KA prior fo the stort of any work, articles, materials, and directed by the architect by the manufacturers, unless otherwise specified on the drawings. 18. All Contractors’ shop drawings shall be A for approval through the prior to work being therwise noted chential mstollatien Schedule cs approved by the delivery of materia! be responsible for openings, etc. any notifying all sul conditions regarding elevator cab size, door and all fees in e use of handling the Manager shol wolved for the use of the hoisting faciities will be the responsibilty of the Construction Mot 21 clear at all times. 22. The C P: construction work. the Genero cleaning, maintainin work, restoring to Construction identification at oll 25. All ladders an: operating condition from the job site 28. The Construct for maint d the areas inv materials. and remov bish, w sh, tre ecratmootion installation of any Subcontractors 31. All existing st during demolition Each Contra shop drawings to ice te Egress routes and fire stairs shall be k 9} machine at all times during the cour 23. Workmen will be ossigned one toil Contractor will be ng, and upon corel jer shall maintain. and ephone and fax e of area which ‘ble for tion of the its original condition. I times. d scaffolding sh All. damaged ion Manager shi and rolling scaffolding shall be immedic! all cleanliness of the work a personnel must corry proper in good bokers, ly remove 26. All windows shall be kept closed in the work 27. Fire extinguishers must be kept on the job site during construction e responsible 20 Wolved in the delivery of his the prem deralition 29. Construction Monager is responsible to cle ses all waste moterials, pings ond salvages as generated by and/or the delivery 0 products, materials, or equipment which is part of the Contrac onstruction Manager will be responsible red for darnages caused by his ruc process 1 submitted shoring to remain; protect shall have a competent intendent on the premises at all res when SNTB 33, All new shoring required for demolition to be ned and seate or approval 1, INTERIOR NON: BEARING PARTTIONS 15, INDICATED ON THE CONTRACT DRAWINGS. INCL BUT NOT LIMITED TO: ELEVATOR SHAFT ENCLOSURES, STAIRWAY #1 ENGL URE, RESTROOM 5. PLUMBING FIXTURES AND RELATED PIPING. 7. STEAM PIPES AND PERIMETER RADIATORS. BRICKS FROM CONCRETE 8. EXTERIOR BRICK PARAPETS AND F 9. ALUMINUM WINDOWS AND FRAMES ON THE NORTH AND SOUTH VJCL ABATEMENT PACKAGE FOR STEEL CASEMENT WINDOWS RAMES BENEATH EXISTING ALUMINUM WINDOWS) OR MASONRY SPANOREL PANELS AND NON~BEARING BRICK 10, EXTEI MULLIONS. 11, ROOFTOP BULKHEAD ENCLOSURES AND CONCRETE STRUCTURE EXCEPT FOR STAIRWAY #2. TE FACADE PANELS ON FLOORS 1, 2 & 3 2. EXTERIOR CONC! END OF MAIN ROOF SLAB AND CONCRETE PARAPET BACKUP AS 3. RTH: INDICATED ON CONTRACT GRAWINGS MASONRY WALLS DIRECTLY BENEATH CON ELOOR SLAB, 14. CONCRETE COLUM! A ROOF SLAB TO BE_RE MOVED. DOWN EXTERIOR MASONRY PILA: BUILDING CODE DATA SITE: BLOCK: 56 LOTS 1 & 3 130 CEDAR: STRE NEW YORK, NEW YORK BUILDING DEPARTMENT NOTES 5, SPRINKLER 6. DRAIN. LEADERS. FREIGH ELEVATOR CAR, EQUIPMENT é& ENCLOSURE Building is to be exomined under Existing CO jes; no change protection or egress Old Code. Building is Closs 1 Fireproof Construction to use, occi 4. Items subject to controlled inspection: None. 5. All work shall comply with NYCDOB require ney, zoning, ents, rules, and regulations. fire ZONING DATA ZONING DISTRICT 9, LOWER MANHATTAN SPECIAL DISTRICT = ZONING MAP ICATION FOR SEE JLC ABATEMENT CONTRACT NGS AND SPI COORDINATION AND EXTENT OF ABATEMENT WORK. [HRW WORK a, KOVAL, a. PLACEMENT OF SHELF ANGLES AT Els FICK PILASTERS TO REMAIN SHING AND WEEP! ANGLE LOCATIONS. 2. INSTALLATION OF AF REINFORCING PINS, CLEM D_REPAIR OF ALL EXISLING-SRICK TO REMAIN. A SAT Si SoS 7 Sra APrROM WINDOW OPENINGS AND SLAB EDGES. 4. INSTALLATION OF SEMI-PERMANENT WATERPROOFING ENCLOSURES AT ROOF BECO WND OPEN MASONRY JOINTS. MENT_UTILTIES! a A wmee 130 CEDAR STREET NEW YORK, NEW YORK SELECTIVE DEMOLITION & FACADE RESTORATION ARCHITECT ‘Teh 212206833 DRAWING LIST SIGN & SEAL 5 29%h See 01-0 TITLE PAGE o1-1 ERIOR DEMOLITION Di-2 EXTERIOR PACADE DEMOLITION AND RESTORATION ORAWINGS TYPE-WRITTEN SPECIFICATION IS PART OF CONTRACT DOCUMENTS Tel. 2129853570 -MEP.PF ENGINEERS: 2 Ter 3183400 CEDAR & WASHINGTON STREET ASSOCIATES, LLC ex ith Soxt Ne ‘STRUCTURAL. ENGINEERS: OCIA ‘SEVERUD AS CONSULTING ENGINEERS PC Seas ‘New York, New York 10016 Fay: 2120689.530 LO} cossuINa ENGINEERS SELECTIVE DEMOLITION & FACADE RES ORS TION TITLE PA ASS New You tT Fans 2120633676 ork, New York 1000 an: 212/560-7382 an

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125070Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →