130 Cedar Street July 15, 2004
Selective Demolition and Façade Restoration Koenen Associates
6. Copy of the approved shop drawings with all data concerning changes made during
construction.
B. Where contents of manuals include Manufacturer's catalog pages, clearly Indicate the precise
Items included In this Installation and delete or otherwise clearly indicate all Manufacturer's data
with which this installation is not concerned.
C. Number of Copies Required: Three (3) of each manual.
2.03 INTEGRATED DRAWINGS
A. The HVAC subcontractor shall prepare a Drawing or Drawing showing duct work, heating
and sprinkler piping. This Drawings shall Include location of grilles, registers, etc., and
access doors in hung ceilings. Locations shall be fixed by elevations and dimensions
from column center lines and/or walls.
B. The HVAC subcontractor shall prepare and distribute to the Plumbing and Electrical
subcontractors, the General Contractor.
C. The HVAC subcontractor shall lay out on his sepia the reflected ceiling plan, beam soffit
elevations, ceiling heights, roof openings, etc.
D. The Plumbing subcontractor shall lay out on his sepia the piping, valves, clean-outs,
etc., indicating locations and elevations and shall indicate the necessary access doors.
E. The Electrical subcontractor shall indicate on his sepia the fixtures, large conduit runs,
clearances, pull boxes, junction boxes, sound system speakers, etc.
•
F. The General Contractor shall indicate on his sepia any structural framing, ceiling hangers,
etc.
G. The General Contractor shall call as many meetings with the subcontractors as are
necessary to resolve any conflicts that become apparent. He will call on the services of
the Consultant Engineer or Architect where necessary. The Construction Manager is
responsible for the coordination of the Drawing or Drawings.
H. On resolution of the conflicts, each subcontractor shall enter his own work on the HVAC
Subcontractor's sepia, which shall become the master or integrated Drawings. The
master sepia shall be signed by each contributing subcontractor to indicate his
acceptance of the arrangement of the work.
A reproducible copy of the master integrated Drawings will be prepared by the HVAC
subcontractor. The General Contractor will make distribution.
J. Each subcontractor shall prepare his Shop Drawings in accordance with the integrated
Drawings. No work will be permitted without approved Shop Drawings. It is therefore
essential that this procedure be instituted as quickly as possible.
PART 3.00 - EXECUTION
3.01 COORDINATION OF SUBMITTALS
A. Prior to submittal for Architect's review, use all means necessary to fully coordinate all
Submittals .1Eci,ie