NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125123
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

130 Cedar Street July 15, 2004 Selective Demolition and Façade Restoration Koenen Associates

6. Copy of the approved shop drawings with all data concerning changes made during construction.

B. Where contents of manuals include Manufacturer's catalog pages, clearly Indicate the precise Items included In this Installation and delete or otherwise clearly indicate all Manufacturer's data with which this installation is not concerned.

C. Number of Copies Required: Three (3) of each manual.

2.03 INTEGRATED DRAWINGS

A. The HVAC subcontractor shall prepare a Drawing or Drawing showing duct work, heating and sprinkler piping. This Drawings shall Include location of grilles, registers, etc., and access doors in hung ceilings. Locations shall be fixed by elevations and dimensions from column center lines and/or walls.

B. The HVAC subcontractor shall prepare and distribute to the Plumbing and Electrical subcontractors, the General Contractor.

C. The HVAC subcontractor shall lay out on his sepia the reflected ceiling plan, beam soffit elevations, ceiling heights, roof openings, etc.

D. The Plumbing subcontractor shall lay out on his sepia the piping, valves, clean-outs, etc., indicating locations and elevations and shall indicate the necessary access doors.

E. The Electrical subcontractor shall indicate on his sepia the fixtures, large conduit runs, clearances, pull boxes, junction boxes, sound system speakers, etc.

• F. The General Contractor shall indicate on his sepia any structural framing, ceiling hangers, etc.

G. The General Contractor shall call as many meetings with the subcontractors as are necessary to resolve any conflicts that become apparent. He will call on the services of the Consultant Engineer or Architect where necessary. The Construction Manager is responsible for the coordination of the Drawing or Drawings.

H. On resolution of the conflicts, each subcontractor shall enter his own work on the HVAC Subcontractor's sepia, which shall become the master or integrated Drawings. The master sepia shall be signed by each contributing subcontractor to indicate his acceptance of the arrangement of the work.

A reproducible copy of the master integrated Drawings will be prepared by the HVAC subcontractor. The General Contractor will make distribution.

J. Each subcontractor shall prepare his Shop Drawings in accordance with the integrated Drawings. No work will be permitted without approved Shop Drawings. It is therefore essential that this procedure be instituted as quickly as possible.

PART 3.00 - EXECUTION

3.01 COORDINATION OF SUBMITTALS

A. Prior to submittal for Architect's review, use all means necessary to fully coordinate all

Submittals .1Eci,ie

NYC-WTC 000125123

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125123Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →