NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004
Selective Demolition and Facade Restoration Koenen Associates
SECTION 01010
SUMMARY OF WORK
PART 1.00 - GENERAL
1.01 GENERAL REQUIREMENT
A. Work of this Section, as shown or specified, shall be in accordance with the
requirements of the Contract Documents.
1.02 WORK INCLUDED
A. Work of this Section includes the following descriptions:
1. Contractor's duties.
2. Codes.
3. Abbreviations and symbols.
4. Color schedule
1.03 CONTRACTOR'S DUTIES
A. Except as specifically noted, provide and pay for
1. Labor, materials and equipment.
2. Tools, construction equipment and machinery.
3. Other facilities and services necessary for proper execution and completion of
the work.
B. Pay required sales, consumer and use taxes, except as specifically excluded by the
Supplementary Conditions. •:
C. Secure and pay for, as necessary for proper execution and completion of work, and as
applicable at time of Contract Award.
1. Permits
2. Government fees.
3. Licenses.
D. Give required notices.
E. Comply with codes, ordinances, rules, regulations, orders and other legal requirements
of public authorities which bear on performance of work
F. Promptly submit written notice to Architect of observed variance of Contract Documents
from the Building Code and other requirement of Public Authorities having jurisdiction.
1.04 APPLICABLE CODE
A. All references to codes, specifications and standards referred to In the Specification
Sections and on the Drawings shall mean, and are intended to be, the latest edition,
amendment and/or revision of such reference standard In effect as of the date of these
Contract Documents.
1.05 ABBREVIATIONS AND SYMBOLS
•
Summary of Work 01010-1
NYC-WTC 000125112
OCR can misread numbers and units. Confirm readings against the page image before using them.