NYC 9/11 Public Portal Document
HVAC INSPECTION/OBSERVATIONS
An inspection was conducted of the mechanical equipment room and associated SAVA-1006-C
TRANE HVAC unit located on the west side of the 7th floor. This unit serves the west side of
the 7" floor. The following was noted:
Mechanical Equipment Room:
The mechanical equipment room was well lit, clean, unpainted, and did not contain stored
materials.
The mechanical equipment room is used as a mixing plenum.
The pipes were not labeled or color-coded.
Air Mixing Chamber:
• The floor doors closed tightly.
• The outside air intake was located at least 25 feet from any apparent source of contaminants
and was protected by a bird screen.
• Damper positions for outside air were open at minimum settings.
• Return air dampers were open at maximum settings.
• The filter bank was framed and contained 15% - 25% efficiency, box-type filters which were
in good condition and are replaced every two months.
Coil Chamber:
• The coils were clean and well maintained.
• Condensate drip pans (CDPs) were clean, and there were no odors or signs of standing water,
condensate, and leaks.
Project: 220490