NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 46/2 SOUTH END av 1082813, 16/7511
Document / 62 pages

HVAC inspection report, 2 South End Ave, Jan 2003

Machine-extracted title · confidence 92%

Duplicate or continuation of the Athenica Environmental Services letter regarding HVAC inspections at 2 South End Avenue.

NYC-WTC_000117893–000117954

Folder label: “2 SOUTH END av 1082813, 16/7511

Page image
Scanned page image, NYC-WTC_000117895
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2 South End Avenue, Manhattan, NY January 30, 2003

Inspection Details:

As part of the survey, the Mechanical and the Environmental Professionals inspected the following HVAC system types. All identification data and visual inspections are documented in the attached checklists.

A. A total of (30) mechanical exhaust fans of kitchens and bathrooms located on the upper root (13) mechanical kitchen and bathroom exhaust fans located on the lower roof and (01) fresh air intake for the elevator room. B. HVAC unit is located on the upper roof and serves north side of the hallways. C. HVAC unit is located on the upper roof and serves south side of the hallways D. HVAC unit is located on the lower roof and serves the 2d floor hallway of the townhouses. E. A/C unit is located on the upper bulkhead of the elevator room and serves the elevator room.' F. One (01) AC split unit is located on the ground floor and serves the gym. G. One (01) AC split unit is located on the ground floor in the playroom and serves playroom. H. One (01) Lobby AC unit is located on the ground floor in the gym area and serves the lobby

Summary of Findings:

WTC related dust was observed in the mechanical exhaust fans # 30, 29,28,26,25, 16, 12, 04 and the lobby AC unit.

Scope of work: m

Cleaning is required to remove WTC related dust from: - The exhaust fans# 30,29,28,26,25, 16, 12, 04 and their associated components. - Lobby AC unit its associated components, located on the ground floor in the gym area and serving the lobby.

S• rely

Vasilis Bellos

Director of Operations Attachments: 1) Ventilation System Evaluation forms

Page 2 of 2

NYC-WTC-000117895

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000117895Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000117830 · Box DEP Box 46

Detailed list of mechanical components including fans, ducts, dampers, and grilles located at the South End Avenue facility.

Filed in the same folder

NYC-WTC_000117831 · Box DEP Box 46

Letter from Athenica Environmental Services reporting HVAC and environmental inspections performed on January 15, 2003.

Filed in the same folder

Compare copies and versions →