NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 46/320 ALBANY STREET 000301, 16/7502
Document / 34 pages

Building inspection checklist for 300 Albany Street

Machine-extracted title · confidence 90%

Form documenting building details and inspection results for 300 Albany Street, including checks for ACM, air monitoring, and facade conditions.

NYC-WTC_000116234–000116267

Folder label: “320 ALBANY STREET 000301, 16/7502

Page image
Scanned page image, NYC-WTC_000116236
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

350 Albany street, Manhattan, NY February 7, 2003

Inspection Details:

As part of the survey, the Mechanical and the Environmental Professionals inspected the following HVAC system types. A. A total of seven (07) mechanical exhaust fans serving the kitchens and bathrooms and laundry rooms located on the main roof and one (1) passive shaft exhaust located on the main roof. Two (02) mechanical exhaust fans serving the kitchen and the bathrooms located on the 7th`'' floor roof. Eight (08) mechanical exhaust systems serving the kitchen and the bathrooms located on the 6'h floor roof. B. One (I) HV unit located on the 166' floor roof and served the elevator room. The system is out of order. C. One (1) AC unit is located on the 16`h floor roof and serves the penthouse # 01. D. One (1) AC unit is located on•the 16TH floor serves the penthouse # 02. E. One (1) HV -1 unit is located in the machine room on the 1 floor, serves the hallways 1" floor to 16'h floor. F. One (I) HV-2 unit is located in the machine room on the 1' floor, serves the rooms corridor and gym in the basement. G. One (1) HVAC unit is located above the ceiling in the coatroom next to the front desk serves the lobby.

All identification data and visual inspections are documented in the attached checklists.

Summary of Findings:

All the mechanical exhaust fans (except the fan # 07 which is serving the laundry rooms) and their associated components and ductworks are covered with WTC related dust. AC unit which is serving the penthouse # 01. The components of the unit and its associated duct need to be cleaned for WTC related dust. All the other systems inspected appear to be free of WTC dust. All the findings are documented in the attached evaluation forms.

Scope of Work:

Clean all the mechanical exhaust fans (except the fan #07 which is serving the laundry rooms) and their associated components and ductworks. The fans are located on the 16th floor, on the 7th and 6th floor roofs. A total of approximately 2600.00 linear feet of duct needs to be cleaned. One (1) AC unit and its associated ducts. A total of 30.00 linear feet of duct needs to be cleaned.

Please feel free to contact me should you require any further information.

Sincerely,

Vasilis Bellos

Director of Operations

Attachments: I) Ventilation System Evaluation forms 2) Maintenance activity reports

Page 2 of 2

NYC-WTC-000116236

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000116236Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →