NYC-WTC_000100673
Report documenting asbestos inspection and cleanup activities conducted by ETS Construction at 114 Liberty Street.
7 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗Header page of an asbestos inspection report for 114 Liberty Street dated March 25, 2003.
NYC-WTC_000102715–000102731Folder label: “INSPECTION REPORTS”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Asbestos Inspection Report Premise No. Inspection Date: 114 Liberty Street March 15 2003 Floor Zip Borough Block Lot Squad # Badge # All 10006 1 (Manhattan) 52 7502 N/A A019 Inspector Building Type Basis of Inspection Photos Taken Penny Theodorellys A WTC Unoccupied Bldg DEP Cleanup No Contractor's Name Sample Number ETS Construction, Inc N/A Address City Sample Number 160 Clay Street, Brooklyn N/A State Zip Phone Sample Number NY 11222 (718) 706-6300 N/A Laboratory Name Owner's Name JLC Environmental Consultants 114 Liberty LLC Address City Address City 200 Park Avenue South, New York State Zip Phone State Zip Phone NY 10003 (212)420-8119 Contact Person Time of Inspection from: 8:00 P.M. — 11:15 P.M. This inspection was the continued monitoring of the DEP clean-up activities at the site. All work to be performed In accordance with contracts WTC-LBC and WTC-LBA. Clarifications and updates were provided to the contractors and residents by e-mail. Copies of correspondence to be incorporated with these Inspection reports.
The JLC Project Monitor was Mr. Michael Atteberry. Mr. Atteberry indicated that he had entered the work area prior to my visit to the site, but that he was not aware of the specifics of the project. I inquired as to whether he had read the scope of work and he stated that he had not. I informed him that I would provide an overview during my walk through but that he should familiarize himself with the scope of work provisions. The site supervisor was Mr. Peter Tomczyk (Certificate # 84306). Mr. Tomczyk Indicated that the shift was to bag out waste and perform some gross cleaning of the areas. Workers were on the 2 nd and 3'd floors.
The inspection disclosed that the demolition activities of walls and ceilings were nearly complete above the 3`d floor. Some Isolation barriers required reattachment. Waste bags blocked the exit from the elevators onto the floors at multiple floors. The bags were piled over six feet high. This practice is unacceptable and had been indicated as a concern by Mr. Lutchmedial during a previous Department inspection. During an update on 3/14/03 from Mr. Lutchmedial, he stated he had addressed the matter with the site supervisor. These were different bags (bagout had occurred since Mr. Lutchmediai's inspection and new trailers were brought in. The practice of storing the waste immediately in front of the elevators must stop.
Access to the third floor from the elevators was completely blocked. Bags were present in the elevators. We accessed the third floor by returning to the fifth floor and taking the stairs. The stairs at the 3'd floor were also blocked but not as completely as the elevators and we were able to climb over the pile (3 to 4 feet high). Upon getting near the apartment on the third floor smoke was visible and the odor was sensible through the respirator filters. Access to the unit was also blocked by bags, but again it was possible to climb over the pile. I observed three workers, one worker had a bucket of water and they were putting out a small fire on the polyethylene. The GFCI had tripped and the area was rather dark. It seemed a temporary lighting chord had fallen and one of the light bulbs broke sparking and starting the fire. A one square foot of polyethylene and duct tape was damaged. House power was on in the podiatrist office.
Bagout was in progress by other workers when we reached the equipment/wash room. The catch basin was not in place and workers rolled the waste passed me to the next room while still in the same PPE. I shouted for them to stop and the project monitor chased them through. A warning regarding proper waste handling was issued. The waste labels did not indicate the NYCDEP as owner. Corrective action required.
Serious conditions noted during the inspection. All work to stop until all waste is properly removed and electrical situation is corrected. All temporary power to be shut down at the GFCI, except for the dedicated power to the negative air machines.
I spoke to Mr. Bob Middleton of ETS, Mr. Mohammed Khan of JLC, and to Mr. R. Radhakrishnan regarding the conditions, the corrective actions and progress of work. 2
NYC-WTC 000102718
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000100673
Report documenting asbestos inspection and cleanup activities conducted by ETS Construction at 114 Liberty Street.
7 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
10 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118190
DEP inspection form for 50 Broadway documenting building characteristics, facade conditions, and asbestos-containing material survey across multiple building faces.
3 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
4 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
5 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115228
Invoice from Benjamin Kurzban & Son to the DEP for work completed at 213 Pearl Street on September 24, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127588
Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
3 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100648
Final notice regarding WTC debris found on exterior surfaces and invitation to participate in City cleanup program.
3 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112486
Form recording facade inspection results and asbestos monitoring status for a commercial building at 45 Wall Street.
4 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119704
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos removal work completed at 57 Ann Street in November 2002.
4 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112085
Header page identifying records related to environmental work at 20 Vesey Street.
4 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000182019
Record of an asbestos inspection conducted at 130 Liberty Street on March 2, 2009, by TRC Environmental Corp.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000181991
Record of an asbestos inspection conducted at 130 Liberty Street on June 3, 2009, by TRC Environmental Corp.
Similarity score 0.962 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000181988
Record of an asbestos inspection conducted at 130 Liberty Street on May 18, 2009, by LVI Environmental Services Inc.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182011
Record of an asbestos inspection conducted at 130 Liberty Street on March 2, 2009 by TRC Environmental Corp.
Similarity score 0.960 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182028
Record of an asbestos inspection conducted at 130 Liberty Street on March 26, 2009, by TRC Environmental Corp.
Similarity score 0.960 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000181984
Record of an asbestos inspection conducted at 130 Liberty Street on May 20, 2009, by LVI Environmental Services Inc.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000102699
Fragmented text from a Department of Environmental Protection inspection report file within Box 35.
Filed in the same folder
NYC-WTC_000102700
Asbestos visual survey form with redacted fields regarding building conditions and inspections.
Filed in the same folder
NYC-WTC_000102705
Header page of an asbestos inspection report form from the NYC Department of Environmental Protection.
Filed in the same folder
Header page of a DEP Asbestos Inspection Report submitted by ETS Construction for the 114 Liberty Street site.
Filed in the same folder
NYC-WTC_000102712
Fragmented page from a visual inspection report for 114 Liberty Street dated March 2003.
Filed in the same folder