Asbestos Inspection Report
Premise No. Inspection Date:
114 Liberty Street March 15, 2003
Floor Zip Borough Block Lot Squad # Badge #
All 10006 1 (Manhattan) 52 7502 N/A A019
Inspector Building Type Basis of Inspection Photos Taken
Penny Theodorellys A WTC Unoccupied Bldg DEP Cleanup No
Contractor's Name Sample Number
ETS Construction, Inc N/A
Address City Sample Number
160 Clay Street, Brooklyn N/A
State Zip Phone Sample Number
NY 11222 (718) 706-6300 N/A
Laboratory Name Owner's Name
JLC Environmental Consultants 114 Liberty LLC
Address City Address City
200 Park Avenue South, New York
State Zip Phone State Zip Phone
NY 10003 (212)420-8119
Contact Person Time of Inspection from:
10:00 A.M. —11:30 A.M.
This inspection was the continued monitoring of the DEP clean-up activities at the site. All work to be performed
in accordance with contracts WTC-LBC and WTC-LBA. Clarifications and updates were provided to the
contractors and residents by e-mail. Copies of correspondence to be incorporated with these inspection reports.
The Project Monitor Mr. Raymond Sculer and the site supervisor Mr. Marek Jendroska (S Cert. #91763) were
present on site at my arrival. Certificates were checked. The following workers were present: handlers
Krasnodebski Cert.# 89763, Narvaez Cert. # 85113, Kriz Cert. # 84178, Olmos Cert. # 92163, Zumba Cert.
#86225, Kosturik Cert. #87739, Chalco Cert. #90476, Capon Cert. #87300, Wlodarczyk Cert. #86387, Ludwiczak
Cert. #86612, Castillo Cert. #90435, Rivera Cert. #91212, Dardzonska Cert. #89997, Hrabovcak Cert. #85959,
Ungarean Cert. #88090, Biemacki Cert. # 85950, Kohut Cert. #84475, Hernandez Cart. #91982, Lozano Cart.
#84967, Bednarczyk Cert. # 89707, Adamczyk Cart. #88433.
The workers exited the work area prior to my entering the area. The site supervisor Indicated they were taking a
lunch break. I commented that It was just after 10:00 A.M. and that it appeared they exited due to my arrival. He
stated that it was not the case, it was break time because they started work early.
I entered the work area with the project monitor and the site supervisor. On the 12th floor, I noted that although the
demolition of sheetrock walls was completed, the wall by the interior stairs south side (above dining area) was not
removed. The wallpaper had been partially removed. The ducts had been removed on the 11th and 12th floors.
The work was done with minimal disruption to the ceiling supports. The wall studs were in good condition.
Demolition was completed with care. At the sixth floor, I noted the duct observed during my previous visit. The
duct was a vertical duct. The area behind the access panel appeared to be an electrical conduit.
Some repair to isolation barriers and the negative air pressure equipment ducting was necessary. The electrical
supply (shut off of all house power and temporary power) still required correction. When asked specific questions
regarding the work the site supervisor indicated, the other supervisor had instructed him on what activities to
perform and that he was not familiar with the previous su rvisors'activities.
2
NYC-WTC 000102719