NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/20 VESEY STREET Block: 88 Lot: 5
Document / 2 pages

Facsimile transmission from CFF Catastrophe, Nov 2001

Machine-extracted title · confidence 95%

Cover sheet for a fax sent by CFF Catastrophe on November 13, 2001 to counsel at 20 Vesey Street.

NYC-WTC_000095205–000095206

Folder label: “20 VESEY STREET Block: 88 Lot: 5

Page image
Scanned page image, NYC-WTC_000095205
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1s'NOV.20.20011 3:30PM cFF CATASTROPHE NO. 652 'P 11'' 1000 t

CORPORATE OFRC6 3ii0warren Street Firms Floorwast Jersey City, NJ 07302 201.916.0080 Fax201-946-2347 November 13, 2001 32 Binet r►Rd. Mr. Mitchell I. Sassowrer Marthero, NY 42622 974-236-7420 Arye, Lustig & Sassower, P.C. Fax st4236.9427 20 Vesey Street NewYoric, NY 10007 40 Surnner Street Quincy, MA 02169 Re: 10'a' Floor Office Cleanup Cost Fax 617-471-8W7

Dear Mr. Sa8s0wer ACSI (Asbestos Containment Services, Inc.) is writing to provide the following cost proposal for work at the referenced location. Our proposal is based upon site visitation. procedure evaluation and the following Items: a® of work • Remove and dispose as asbestos contaminated waste (ACW) all carpeting and padding from noe office location of approximately 315 sf.

• Thoroughly HEPA vacuum and wet wipe all surfaces in the affected office including furniture, books, window silis, personal Items, etc.

• All labor, equipment and materials necessary to provide cleanup as indicated above.

• All work to be performed in accordance with dust control procedures by NYCDEP and NYSDOi. oertlfied asbestos handlers.

• Disposal of all waste generated due to our work as asbestos containing. Proper waste manifest disposal documentation will be provided upon completion.

• Comprehensive general liability Insurance and w orlc®rs compensation insurance with statutory limits. • Work win be completed in two shifts during day, evening or weekend periods. Shift one for mobilization, remolvai and cleaning. Shift two for teardawn, waste removal and demobilization after setisfaotory air ciearance results.

P

Our total lump sum price for the project is $5 (Five thousand fçijzr hundred

ACSI will require payment at the completion of the work, prior to demobilization of the project.

NYC-WTC 000095205

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095205Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →