Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.

NYC-WTC_000125698–000125753

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125714
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document VI/ / VV.) VO. LO rr1A OMO MIL JLVI LQYQl UUIIJI IUl.l1 UII UUI F.I. 1QJV 10/V 13 ,

01/26/2005 08:21 17325653654 NOVA DEVELOPMENT GRP PAGE 13

B.AIST.COAST JHAZ•MAT REMOVAL,INC Asbestos Abatement Contractor 494 E,41 Street Paterson, NJ 07604 Phone:(973) 3,4,5-0022 Fax:(973)3464665

Building Interior Cleanup at 130 Cedar Street, NYC,

A NYSDOL licensed asbestos contractor shall perform work with'NYCDEF and NYSDOJi. asbestos certified workers. The interior cleaning should be part of pre-abatement procedure. All critical barriers shall he covered with a two Layers of polyethylene. shooting. Al) debris r4uet be collected for disposal as ACM directly upon removal from the surface (i.q— All Waste must. be .double bagged In ACM waste labeled bags). Running water or water runoff In the building Is not permitted, All water will be collected and dykes to a filter prior to discharge to the setnitary sewer. All T.WAC ayetems and air conditioners shall be turned off. All windows shall be closed during the Interior cleaning and cover with two layers of polyethylene sheeting. AU horizortmi surfaces shall be cleaned of large bulk material by wetting and band with non-metallic bristle hmphes or neizi-metallic sarapere, by wet wiping brushing or scraping top to bottom. Amended water shall be used for wet wiping and low-pressure and/or HEPA vacuuming from material shall be Immediately placed Into containers (e,g, bags). Windows shall washing. The removed running water shall not he evident during this procedure, Power for HEPA vacuums he wet wiped. Free through ground fault Intamtpteru. shall he supplied

After completion of debris removal, the specified area shall be carefully washed. A low pressure cashing technique. moving from top to buwom shall be entpleye:d to minimize water shall be washed with a low pressure wash act to exceed 250 bounce back. Al) §urfacas psi,

Al the complation of work, a

visual

inspealon of the abated aurfaoes and sidewalk shall be performed to the verify

absence

of

visible

debris.

An

independent

NYSDOL

licensed

third

party

Method) with certified workers. air

-monitoring

first

shall

perform air

monitoring

(via

TEu1

NYC-WTC 000125714

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125714Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →