Asbestos project notification form, 100 Church Street

Machine-extracted title · confidence 90%

NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.

NYC-WTC_000126772–000126779

Folder label: “100 CHURCH STREET Block: 125 Lot: 20 BIN: 1001409 44-80 PARK PLACE, 21-35 WEST BROADWAY, 45-75 BARCLAY ST

Page image
Scanned page image, NYC-WTC_000126777
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• <+, r.! s i} ~•. F' IDranch VVV Wker& A Clea,iw EiwirOIc8C 8e M' -lout, 1975 November 13, 2001

To: N.Y.C.D.E.P. Asbestos Control Program

Attention: Mr. Peter Lee Kim 563 7300, 101-2 Colin Drive, Holbrook, NY From: Branch Services (Asbestos Contractor) 631 dust and debris at 100 Church Street, Manhattan Re: Clean up of dust and asbestos containing

Locations as Follows: Mezzanine-Southwest Corner-4000 Sq. Ft. 7"' Floor-Entire Office Space-42,000 Sq. Ft. Ft. 8`h Floor-East Side and Northeast Corner-12,000 Sq. 10th Floor-Southwest Comer-3,000 Sq. Ft. 11th Floor-Southwest Comer-2,000 Sq. Ft. 12th Floor-Southwest Corner-6,000 Sq. Ft. Ft. 14th Floor-Southeast Side of Core Area-2,000 Sq. Core Area -1,($00 Sq. Ft. 16`h Floor-South Central Side of 20`h Floor-Southwest and East Sides-7,500 Sq. Ft.

Surface types: All, including contents.

StartingDae/Tune- 8.00 ant November 14,200 I

Scope of work: and analysis of settled dust samples. Areas Ambient Group Inc. performed the asbestos survey Ambient analyses and listed above willbe cleaned containing asbestos dust and debris as shown by the ulations project in accordance with all the aynliCable_ em by Branch Services as an asbestos abatement be N.Y.C. Title 15. The total square footage of areas to o_f N X S Industrial Code Rule 56 and 75,500. cleaned as an asbestos project by Branch Services is oor storeroom, off the elevator hall. Isolation A remote showering unit will be set up on the first fl established. H.E.P.A. filtered air filtration units barriers will be erected. Engineering controls will be the air and stop the asbestos fibers from entering will be set up in all areas to constantly filter areas and all contents using H.E.P.A. uncontaminated portions of the space. We will clean all work le bagged in 6 os debris will be vacuuming and wet wiping methodology. ~~bo a D.E.C.apa proved disposal site. A copy of the mil polyethylene asbestos bags and transported upon our receipt. landfill waste manifest will be mailed to the owners Damage Rostoratlon, Environmental Consulting It Remedlatlon

101-2 Colin Drive • Holbrook. NY 11741 1-563-7389 Phone 631-563-7300.800-734-9947 • Fax 63, Email: hranchservices aol.com S3nTANSS HDN17219 68ELE99TE9 60:91 T007/ET/TT 7 9'd

NYC-WTC 000126777

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000126777Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →