NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 31/Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church
Document / 4 pages

Asbestos project notification form, 100 Church Street

Machine-extracted title · confidence 50%

Application form submitted to DEP for an asbestos inspection or abatement project at 100 Church Street.

NYC-WTC_000154727–000154730

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154728
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Branch Sl'iniCI S. IML D X cleaner Bfwtroftineftir - finc^ f97S November 13,2001

To: N. Y.C.D.E.P. Asbestos Control Program

Attention: Mr. Peter Lee Kim

From: Branch Services (Asbestos Contractor) 631 563 7300,101-2 Cohn Drive, Holbrook, NY

Re: Clean up of dust and asbestos containing dust and debris at 100 Church Street, Manhattan

Locations as Follows: Mezzanine-Southwest Comer-4000 Sq. Ft. 7* Floor-Entire OfBce Space-42,000 Sq. Ft. 8“* Floor-East Side and Northeast Comer-12,000 Sq. Ft. 10* Floor-Southwest Comer-3,000 Sq. Ft. 11* Floor-Southwest Comer-2,000 Sq. Ft. 12* Floor-Southwest Comer-6,000 Sq. Ft. 14* Floor-Southeast Side of Core Area-2,000 Sq. Ft. 16* Floor-South Central Side of Core Area-1,000 Sq. Ft. 20* Floor-Southwest and East Sides-7,500 Sq. Ft

Surface types: All, including contents.

Starting Date/Time: 8:00 am. November 14. 2001

Scope of work:

Ambient Group Inc. performed the asbestos survey and analysis of settled dust sanqjles. Areas containing asbestos dust and debris as shown by the Ambient analyses and listed above will be cleaned by Branch Services as an asbestos abatement projectjrr ■dance withall the >licable regulations of N.Y.S. Industrial Code Rule 56 and N.Y.C. Title 15. The total square footage of areas to be cleaned as an asbestos project by Branch Services is 75,500.

A remote showering unit will be set up on the first floor storeroom, off the elevator halt Isolation barriers will be erected. Engineering controls will be established. H.E-P. A filtered air filtration units will be set up in all areas to constantly filter the air and stop the asbestos fibers from entering unconti mated portions of the space. We will clean all work areas and all contents using H.E.P.A vacuuming and wet wiping methodology. All asbestos containing debris will be double bagged in 6 mil polyethylene asbestos bags and transported to a D.E.C. approved disposal site. A copy of the landfill waste manifest will be mailed to the owners upon our receipt. ’ »7 )01 Damasa RaatoraUan, Envlranmanlal CansulUng 6 Ramadlatlon 101-2 Colin Drive • Holbrook. NY 11741 Phone 631-563-7300 • 800-734-9947 • Fax 631-563-7389 Email: [email protected] Z0 39Wd saoiAaas honwhs Gsezegsieg sb.-qt laaz/eT/Tt NYC-WTC_000154728

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154728Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →