INNFAX SERUICE P. 1.
ZAR REALTY
100 CIIRIRCH STREET
NEW YORK.NY
SETTLED DUST BULK SAMPLING RESULTS
September 28.200 t
)<AOR/ # OF AREAS NEEDING SQUARE FEET
LEVEL BULKS AS13F..STOS CLEANUP OF AREA (Si) REMARKS
Sub-Cellar Area Not Accessible. No samples NA Level Flooded
Caller 12 Engine room and all areas with dust 30,
12 Dept ofLabor (South est side) 4,000
Lobby Area Front Entrance 2,000
Moianlne l South West Corner 4,000
24 NO WORK ON THIS FL All samples negative
3 19 NO WORK ON THIS FLOOR NA All samples negative
i9 NO WORK ON TIlLS FLOOR Ilk All samples negative
S 19 NO WORK IS FLOOR NA Allzamplesnegntho
6 19 NoithEzatSide 2,000
7 12 Entlra Office Space of Floor 42,000
MER-Frcsh air Intake/Plenum 1,300 Including all filters
8 18 EiSideofFloor 8,000
North East Comer 4,000
9 NO WORK ON THIS FLOOR NA All samples negative
10 10 South West Corner 3,
11 12 o West Corner 2,000
TTh M
10 South West Corner 6,000
141 n1 12 South East Sidc o Coro Area 2,000 Fire Door w/ACM
1S 12 NO WORK ON IBIS FLOOR NA Alfiamples negative
16 South ContrafSide of Core Area sire Door w/ACM
17 1 NO N THIS FLOOR NA Alf samples negative
I A • \ \\•''fl Il I—# /1/`A
/t0 ,,..on,,.
19 17 Siith West Side 2,500 Two locations
14 South West Side
East Side 3,000
21 ' -
Penthouse . 8 Rest Rvom•North West Cantor 250
MBRs 19 Abandoned Unit (DC•2) 100Remaining areas of the
(East and East and West Fan
West side) Rooms-all samples
negative
Roofs 5 All exposedliorizontal surfaces and RoofAreas: 54,000 Based on footprint of
(206 and all exterior ledges on facade. Also building and all
above) all roof entrances into building. Facades: 230,000 facades.
1OTAIS: Interior: 121,650
Roof Arens: 54,000
1~acade9: 230.000
GR.NID TOTAL: 405,6650
NOTES:
1. Quantity of affected areas per area per floor to be cleaned is approximate. Final determination to be
made in field with Engineer.
2. Air filters in all Air Handling equipment are to be removed and disposed as contaminated debris.
Coordinate with Building Engineer for exact locations of units.
3. Al other areas of respective floors, in which bulk samples testod negative for the presence of asbestos,
cleanup can proceed as non-asbestos project.
4. On floors with non-ACM and ACM areas coordinate with Building Management. Recommend that all
ACM cleanups be completed prior to general cleanup,
211334