NYC 9/11 Public Portal Document
INNFAX SERVICE P. 1
ZAR REALTY
100 CHURCH STREET
NEW YORK, NY
SETTLED DUST BULK SAMPLING RESULTS
Sentembcr 28.2001
FLOOR/ # OF AREAS NEEDING SQUARE FEET
LEVEL BULKS ASBESTOS CLEANUP OF AREA (SF) REMARKS
Sub-Cellar Area Not Accessible. No samples NA Level Flooded
C11ur 12 Engine room and all areas witht ust 30,0
12 Dept of Labor (South est side) 4,000
Lobby Area Front Entrance 2,000
Mownlne I South est Corner 4,000
24 WORK ON THIS lL O All samples negative
3 19 NO WORK ON THIS FLOOR NA All samples negative
19 ff0 WORK ON All samples negative
5 19 NO WORK OWtX1IS FLOOR NA All samples nognt e
6"' l9 NorthEastSlde 2,000
7 12 Entire 0(11cc Space of Floor 42,0
MER-Frcsh air Intake/Plenum 1,300 Including all filters
18 P Sic1e of Floor 8,GOO
North Fast Cornor 4,000
9 NO WC$RK ON THIS FLOOR NA All samples negative
10 10 South WCómer 3,
IT" 12 South West Corner 2,000
10 South West Cornor 6,000
l South East Sidc of Coro Area 2,000 Fire Door w/ACM
1S 12 NO WORK 0 FLOOR NA AWiamples negative
16 South Central Side of Core Area ire Door w/ACM
17"' 1 NO THIS FLOOR TA All sam les negative
n •. . ...'sn" " r'rs kIA Alt rqo n-noti.rn
19 17 Suth West Side 2,500 Two ocations
14 South West Slde
East Side 3,000
2l -
Penthouse 8 Rest Room-North West Cornor 250
M13Rs 19 Abandoned Unit (DC-2) 100 Remaining areas of the
(East and East and West Fan
West side) Rooms-all samples
negative
Roofs 5 All exposed horizontal eu aces and Roof Areas: 54,000 Based on footprint of
(20th and all exterior lodges on facade. Also building and all
above) all roof entrances into building. Facades; 230,000 facades.
T TAI 324 Interior: 121,650
Roof Areas: 54,000
Facade,- 230.000
__ _..._. . GRANA TOTAL: 405,650
NOTES:
1. Quantity of affected areas per area per floor to be cleaned is approximate. Final determination to be
made in field with Engineer.
2. Air filters in all Air Handling equipment are to be removed and disposed as contaminated debris.
Coordinate with Building Engineer for exact locations of units.
3. AU other areas of respective floors, in which bulk samples tested negative for the presence of asbestos,
cleanup can proceed as non-asbestos project.
4. On floors with non-ACM and ACM areas coordinate with Building Managenmtent, Recommend that all
ACM cleanups be completed prior to general cleanup.
211334
va 99tid
6SELFS;TE9 Sn ST Icn7./r T/TI
NYC-WTC 000126761
OCR can misread numbers and units. Confirm readings against the page image before using them.