SETTLED DUST BULK SAMPLING RESULTS
September 28, 2001
11 OF AREAS NEEDING SQIJARE FEET
FLOOR/
ASBESTOS CLEANUP OF AREA (SF) 1 EMARKS
LEVEL BULKS
Area Not Accessible. No samples NAlevel Floodcd
b-Ce lar
22 Engine room and all areas with dust 30,0
12 Dcpt of Labor (South West side) 4,000
Lobb Area Front Entrance 2,000
Sou eat omen 4,000
Mohan e 1
WORK ON THIS PL it sauttplcs negative
24
NA All seuipca nega va
19 NO WORK ON ThIS FLOOR All same negative
19 O ON
NO WO lS Fl. OR HA All samples negative
5 19
st de 2,000
6 19
12 EntIre Office Space of Floor 42,
7
MER-Fresh air Intake/Pleaaum 1,300 Including all filters
g 18 EiSide of Floor
North East Corner a000
10W fl HWEORTT NA All samples negative
9" T8
10 10 South WóitCorner 3
SóiIth West Corner 2,000
11 12
10 South West Corner 6,000
1 12 South East Side at Cern Ar s 2,000 Fire Door w/ACM
es negative
15 12 WO WORK ON THIS FLOOR
South tin Side of Core Areal , ire Door w/ACM
l6 10
17 1 NO WORK ONTHIS FLOOR NA Al samples negative
Söüth West Side 2,500 Two locations
19 17
14 outh est a
East Side 3,000
21 - 250
Penthouse 8 Rest Room•North West Corner
me
100 Remaining areas of the
MBRs 19 Abandoned Unit (DC-Z)
East and West Fan
(East and Roomsa1 samples
West aide) negative
Roofs 5 AHexposedhOriZOfltb15U1faC 11d Roof Areas: 54,000 Based on tootpiliWóf
building and all
(20th and all exterior ledges on facade. Also
building. Facades; 230,000 facades.
above • all roof entrances into
324 Interior: 121,650
T TA -
Roof Areas: 34,000
flu d ; 230.000
GRANT) TOTAL: 405,650
NOTES:
approximate. Final determination to be
1. Quantity of affected areas per area per floor to be cleaned is
made in field with Engineer.
disposed as contaminated debris.
2. Air filters in all Au Handling equipment arc to be removed and
Coordinate with Building Engineer for exact locations of units.
negative for the presence of Asbestos,
3. All other areas of respective floors, in which bulk samples tested
cleanup can proceed as non-asbestos project. Management. Recommend that all
4. On flows with non-ACM and ACM arcac coordinnte with Building
ACM cleanups be completed prior to general cleanup,