SETTLED DUST BULK SAMPLING RESULTS
September 28,2001
FLOOR/ #OF 7 AREAS NEEDING SQUARE FEET
LEVEL BUr>KS ASBESTOS CLEANUP OF AREA (SF) REMARKS
Sub-Cellar Area Not Accessible. No samples NA Level Flooded
^ellw
■pn
,12 Engine room and all areas with dust 3W0
12 Dept of Labor (South West side)
Lobby Area @ Front Entrance 2,000
Mezzanine I South West Comer 4,000
24 'NO WORK ON THIS FLOOR : NA All samples negative
s’® 19 NO WORK. ON THIS FLOOR NA All samples negative
T^ IT NO WORK ON THIS FLOOR NT" All samples negative
ym 19 NO WORK ON THIS FLOOR NA All samples negative
19 North East side 2,000
T" 12 Entire Office Space of Floor 42,000
MER'Frcsh air Intake/Plenuin 1,300 Including ail (liters
8"’ IS East Side of Floor ——^550"
North East Comer 4,000
18 NO WORK ON THIS FLOOR ___________ NA Ail samples negative
TcF" 10 Sooth West Comer sW"
TP" 12 South West Comer 2,000
TJ™" 10 South West Comer 6,000
TT South East Side oF Coro Area 2,000 Fire Door w/ACM
15^ 12 NO WORK ON THIS FLOOR All samples negative
IT South Central Side of Core Area 17555" I^ire Door w/ACM
17^ TT NO WdRK ON THIS FLOOR Ta’ All samples negative
Alte.RT.r.ij
txrwrTt
19^ 17 "South West .Side . 2,500 Two focabons
IT South West Side ^355”
East Side 3,000
21^
Penthouse. 8 Rest Room-North West Comer 250
MERs 19 Abandoned Unit (DC-2) Ranaining areas of the
100
(East and East and West Fan
West side) Room>oll samples
negative
Roofs 5 AU exposed horizontal surfaces and Roof Areas: 54,000 Based on footprint of
(20* and all exterior ledges on facade. Abo building and all
above) all roof entrances into building. Facades: 230,000 facades.
TOTALS: 324 Interior: 121,650
Roof Areas: 54,000
Facades; 230.000
GRAND TOTAL: 40SX»0
NOTES:
I. Quantity of affected areas per area per floor to be cleaned is approximate. Final determination to be
made in field with Engineer.
2. Ah filters in all Air Handling eq^uipment are to be removed and disposed as contaminated debris.
Coordinate with Building Engineer for exact locations of units.
3. Ail other areas of respective floors, in which bulk samples testod negative for the presence of asbestos,
cleanup can proceed as noa-asbcsios project.
4. On floors wldi non-ACM and ACM areas coordinate willi Building Management. Recommend flint all
ACM cleanups be completed prior to general cleanup,