NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 31/Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church
Document / 4 pages

Asbestos project notification form, 100 Church Street

Machine-extracted title · confidence 50%

Application form submitted to DEP for an asbestos inspection or abatement project at 100 Church Street.

NYC-WTC_000154727–000154730

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154730
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

INNFAX SEFWICE P. 1 I ZAR REALTY 108 CHURCH STREET NEW YORK* NY SETTLED DUST BULK SAMPLING RESULTS

September 28,2001 FLOOR/ #OF 7 AREAS NEEDING SQUARE FEET LEVEL BUr>KS ASBESTOS CLEANUP OF AREA (SF) REMARKS Sub-Cellar Area Not Accessible. No samples NA Level Flooded ^ellw ■pn ,12 Engine room and all areas with dust 3W0 12 Dept of Labor (South West side) Lobby Area @ Front Entrance 2,000 Mezzanine I South West Comer 4,000 24 'NO WORK ON THIS FLOOR : NA All samples negative s’® 19 NO WORK. ON THIS FLOOR NA All samples negative T^ IT NO WORK ON THIS FLOOR NT" All samples negative ym 19 NO WORK ON THIS FLOOR NA All samples negative 19 North East side 2,000 T" 12 Entire Office Space of Floor 42,000 MER'Frcsh air Intake/Plenuin 1,300 Including ail (liters 8"’ IS East Side of Floor ——^550" North East Comer 4,000 18 NO WORK ON THIS FLOOR ___________ NA Ail samples negative TcF" 10 Sooth West Comer sW" TP" 12 South West Comer 2,000 TJ™" 10 South West Comer 6,000 TT South East Side oF Coro Area 2,000 Fire Door w/ACM 15^ 12 NO WORK ON THIS FLOOR All samples negative IT South Central Side of Core Area 17555" I^ire Door w/ACM 17^ TT NO WdRK ON THIS FLOOR Ta’ All samples negative Alte.RT.r.ij txrwrTt 19^ 17 "South West .Side . 2,500 Two focabons IT South West Side ^355” East Side 3,000 21^ Penthouse. 8 Rest Room-North West Comer 250 MERs 19 Abandoned Unit (DC-2) Ranaining areas of the 100 (East and East and West Fan West side) Room>oll samples negative Roofs 5 AU exposed horizontal surfaces and Roof Areas: 54,000 Based on footprint of (20* and all exterior ledges on facade. Abo building and all above) all roof entrances into building. Facades: 230,000 facades. TOTALS: 324 Interior: 121,650 Roof Areas: 54,000 Facades; 230.000 GRAND TOTAL: 40SX»0

NOTES: I. Quantity of affected areas per area per floor to be cleaned is approximate. Final determination to be made in field with Engineer. 2. Ah filters in all Air Handling eq^uipment are to be removed and disposed as contaminated debris. Coordinate with Building Engineer for exact locations of units. 3. Ail other areas of respective floors, in which bulk samples testod negative for the presence of asbestos, cleanup can proceed as noa-asbcsios project. 4. On floors wldi non-ACM and ACM areas coordinate willi Building Management. Recommend flint all ACM cleanups be completed prior to general cleanup,

211334

bQ 39yd S30iAy3S HONvyg 68EZE95TE9 G0:ST IBad/ET/TI

NYC-WTC_000154730

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154730Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →