Folder label / City-provided: North Access Connection, AMTRAK 10th Ave. Tunnel

33 documents · 98 pages

DEP sewer chamber structural design comments, June 1984

NYC-WTC_000165786 – NYC-WTC_000165789

Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.

4 pages
DEP comments on sewer chamber structural computations, June 1984

NYC-WTC_000165790 – NYC-WTC_000165793

Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.

4 pages
Transmittal of structural computations for sewer chamber, May 29 1984

NYC-WTC_000165794

Letter from STV&K submitting omitted structural computations for a sewer chamber to the Department of Environmental Protection.

1 pages
STV&K revised utility drawings and sewer computations, May 1984

NYC-WTC_000165795 – NYC-WTC_000165796

Letter from STV&K submitting revised drawings for utility work and structural computations for sewer chamber to DEP for review and approval.

2 pages
STV&K revised project drawings submission, May 1984

NYC-WTC_000165797 – NYC-WTC_000165798

Letter from STV&K submitting revised utility and project drawings and sewer chamber computations to DEP, incorporating earlier department comments.

2 pages
Excavation and backfilling specifications, 10th Ave Tunnel

NYC-WTC_000165808 – NYC-WTC_000165821

Technical specification section detailing requirements for excavation, backfilling, grading, and related work for the tunnel project.

14 pages
Transmittal cover sheet, 10th Ave Tunnel, Nov 1983

NYC-WTC_000165829 – NYC-WTC_000165830

Cover letter from the Department of Transportation Bureau of Planning and Research transmittal documents to various city agencies.

2 pages
STV&K revised plans submission for 10th Ave Tunnel, Nov 1983

NYC-WTC_000165833 – NYC-WTC_000165834

Letter from STV&K submitting revised engineering plans for the 10th Avenue tunnel project in accordance with DEP comments.

2 pages
Internal sewer capacity memo, 10th Ave Tunnel, Nov 1983

NYC-WTC_000165835 – NYC-WTC_000165836

Inter-departmental memorandum confirming that a proposed 30-inch RCP sewer has adequate capacity for the tunnel project.

2 pages
Revised plans transmittal, 10th Ave Tunnel, Nov 1983

NYC-WTC_000165840 – NYC-WTC_000165841

Letter from engineers submitting revised plan sets in response to previous department comments on the tunnel project.

2 pages
Handwritten hydraulic calculations, 10th Ave Tunnel, Nov 1983

NYC-WTC_000165842 – NYC-WTC_000165843

Handwritten calculation sheet detailing flow rates and dimensions for the proposed sewer connection in 10th Avenue.

2 pages
Meeting minutes transmittal, 10th Ave Tunnel, Oct 1983

NYC-WTC_000165849 – NYC-WTC_000165850

Letter from engineers enclosing minutes of an October 11, 1983 meeting between NYC DOT and MTC.

2 pages
Transmittal cover sheet, 10th Ave Tunnel, Sep 1983

NYC-WTC_000165851 – NYC-WTC_000165852

Cover letter from the Department of Transportation transmittal documents to the DEP Bureau of Sewers and other agencies.

2 pages
General notes for drainage work specifications, 10th Ave Tunnel

NYC-WTC_000165853 – NYC-WTC_000165859

Contract notes specifying requirements for maintaining existing connections and restoring manholes during tunnel construction.

7 pages