E-mails R. Avaltroni 2002 — page 2
Potential health risks from exposure to asbestos fibers should be determined by air sampling.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Potential health risks from exposure to asbestos fibers should be determined by air sampling.
Summary Document outlining key personnel and roles within the Department of Environmental Protection during the immediate aftermath of the September 11 attacks.
re pany that was doing asbestos removal moval teams combed lower Manhattan work on downtown buildings yester streets.
Summary Letter from a company to DEP confirming minimal dust and cleaning at 1 Battery Park Plaza following the September 11 attacks.
NEW YORK, NY 10016 FULL 5Il C.480~e47QRtJi5 TEL: (212) 679-8800 • FAX; (212) 679.9392 PLM Bulk Asbestos
Summary Form documenting the tracking and handling of environmental samples collected by the Department of Environmental Protection.
PCM cannot distinguish asbestos from other non asbestos fibers (e.g., fibrous glass), whereas TEM has that ability.
Summary Itemized invoice from Asbestos Removal Corp. detailing costs for asphalt and gravel roof cleanup at 110 Liberty Street.
TOR OFOnL ha Rane: _ ASBESTOS PROJECT NOTIFICATION = a (ASBESTOS INSPECTION REPORT) 1.
Summary A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Will you test for dioxin and lead and substances other than asbestos? We will test for asbestos in air.
Summary Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.
Summary Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
AsbeStos Hauler Tri State Transfer Assoc.
addition, all air testing is problematic for determining whether there is an asbestos problem, and often produces completely negative results, even when asbestos is later discovered.
Summary Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
specifically for asbestos or SVF (I.e., TEM or SEM analysis).
I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program Rules.
Summary Invoice from an asbestos removal contractor detailing roof cleanup services performed at 45 Wall Street in September 2002.
ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan 14.
Summary NYC DEP Asbestos Project Notification form for inspection report submission.
ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan 14.
Summary An invoice from M1 Val Corp detailing costs for asbestos roof cleanup services performed at 10 Maiden Lane in July 2002.
ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. 13.
Summary July 2002 invoice from Asbestos Removal Corp for asphalt and gravel roof cleanup at 22 Maiden Lane.
ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan 14.
Summary Letter reporting asbestos testing results for air and dust at Borough of Manhattan Community College in February 2002.
The AHERA post asbestos abatement clearance criteria is defined as an airborne asbestos fiber concentration less than 70 structures per millimeter squared (<70 s/rnm2).
Summary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Asbestos Air Monitoring 1. Five (5) pre-cleanup air samples shall be collected outside but in the general vicinity of the work site.
Summary Application for a permit to conduct interior cleaning by a licensed asbestos contractor at 114 Liberty Street.
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.