NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/22 MAIDEN LANE 1001080, 64/2
Document / 2 pages

Invoice for roof cleanup, 22 Maiden Lane

Machine-extracted title · confidence 95%

July 2002 invoice from Asbestos Removal Corp for asphalt and gravel roof cleanup at 22 Maiden Lane.

NYC-WTC_000102134–000102135

Folder label: “22 MAIDEN LANE 1001080, 64/2

Page image
Scanned page image, NYC-WTC_000102135
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ioWT Nr'6 15 9YF ENVIRONMENTAL PROTECtION Asbestos Control Program pact,rra W49 59-17 Junction Boulevard, 8"' Floor. Corona, NY 11368-5107 ONLY t TYPEWRITTEN V4 fl ii " 1 i ASBESTOS PROJECT NOTIFICATION 8 FCRR Oc .u y

FORMS $ILL BE (ASBESTOS INSPECTION REPORT) ACCEPTED i «ww.nyc.to. deo

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities. i. FACILITY

2. Address 22 Maiden Lane BorougiIanhattan Zip 10005 AKA 3 BIc o k Ad 2 5. Type of Facility 6. Name of Building ii. BUILDING OWNER 4 7. Name Windsor Place Corp. 8. Contact Person

9. Tel.# Fax 10. Address City State Zip ill. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan 14. Federal Employer iD. #_._ _ _ _ _ _P11 15. Tel # 718-961-4100 Fax# 718-961-4103 16.Address 14-20 129th Street c t ollege Point state NY Zip 11356 V. THIRD PARTY AIR MONITOR• Warren & Panzer Engineers, P.C. 17.Name 18 Contact Person Michael Nolan 19. Federal Employer ID. # 20.Tel.# 212-922-0077 Fax# 212-922-0630 21. Address 228 East 45th Street city New York State NY 10017 Zip 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP #_11 251 Vi. PROJECT INFORMATION 24. Starting date for this portion of work 1 ° L Projected completion date

Asbestos work schedule onday uday ci ednesd Thursday daX,,( Saturday..~Sunday

Shift from: S I m Opm to _____Dam

ijIm If other. specify R O Access to inspect the premises must be provided during the work schedule indicated in this item. 1T4 JUL t Q 1 82002 LWb 13

25. Total amount of asbestos-containing material to be abated during this work 260 Square Feet, and/or Linear Feet I£ ACP 7 212001

T.

NYC-WTC 000102135

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102135Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →