NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146443
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT (continued) ... 26. AsbeStos Hauler Tri State Transfer Assoc. NYS DEC Pennft # 1A-375 Tel--- Dlsposal Slte(s) BFI Imperial Landfill, 11 Boggs Road, PO Box 47, lmperlal, PA 15126

27. This asbestos abatement Is part of a (Item a through e requires flDng of this fonn with NYC Department of Buildings) a) D Demolition , b} D Boller Replacement c) D Sprinkler Replacement d) D Renovation/Alteration e) D Fireproofing Replacement f) ~Other (Describe) _A_C_M_C_l_ea_n-U_"""P_On_l"""y_ _ _ _ _ _ _ _ _ _ _ _ __ 28. TYPE OF ABATEMENT (Check all appropriate boxes) la Removal D Enclosure D Encapsulation D Repair D Clean up 29. ABATEMENT PROCEDURE (Check all appropriate boxes) l!I Fun Containment D Glovebag D Tent D DEP Variance Application *See Note () 11;. 30. LOCATIONS OF ABATEMENT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(•) OF FLOOR CONTAINING ACM PERFORMED (e.g. entire. 811111 ~.roam I, (e.g. Pipe fagging, aelllng, plenum SQUARE LINEAR (e.g. nmnlng cabla, lnalalllng fire aprlnlders, baller- lnhhW etcl ... _ ..................... .._etc.\ FEET FEET .........inn and .....""""" bollera etc.l Ground Entire 1 ACM Debris Clean-Up 5,600 ACM Debris Clean-Up Only

... ,

* ACM Debris Was Onl• Found Via Micro- VacuWll Sampl ing And Analysis

Note: Above areas to be abated as p er World Trade Center Protocol Le~~e r of Work Procedures For Debris Clean-Up And The Attached Method Of Proc 31. I hereby declare that the lnfonnatlon provided herein Is true and complete to lhe best of my knowtedge. I am familiar with Federal, durt State and NYC laws and regulations eppllcable to asbestos related work.

Alrtek Environmental, Inc•

. ·t 32. I understand that as the owner of a building where asbestos abatement acllvlty occu am reaponslble for the performance of the asbestos abatement actlvltles In accordance with the Control Progra las. I have contracted the third party air monitor who Is completely Independent of all parties n the lgMIQJ:>& DlrUIBMU' 1 hereby declare that I have authorlzad the filing of this notification for the work specified herein. Resnick Murray Street Associates, Inc. 4/9/03 Jack R~l°'l*'sons Inc., As en A STAMPED COPY OF THIS FORM INC DING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.

I Any modification of Information provided on this form must be reported lmmedlate!x In writing directly to the NYC DEP ACP. The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened throu h the rfonnance of work In Incremental or lecemeal fashion.

NYC-WTC_000146443

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146443Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →