DEP Hard Copies (68 Boxes) / DEP Box 54
NYC-WTC_000132499Machine-extracted title Lab reportSummary A DEP report describing ambient outdoor air monitoring for asbestos in Lower Manhattan following the World Trade Center disaster.
There is currently no
outdoor ambient standard for asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 54
NYC-WTC_000132420Machine-extracted title FormSummary JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
Asbestos crew shower out
Lunch begin
Asbestos crew back to woek
Start to Bag:out
Hsbestos crew, finish baj out and stast to
oRake-dain serling tile
contiesa preeniti seoneestos colect
ill dedRis in org-
Asfestos crew shower
DEP Hard Copies (68 Boxes) / DEP Box 54
NYC-WTC_000132536Machine-extracted title Permit applicationSummary A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
The carpet in the entire space will be removed and double bagged
and disguarded as asbestos waste.
17.
DEP Hard Copies (68 Boxes) / DEP Box 54
NYC-WTC_000132523Machine-extracted title Permit applicationSummary A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
The carpet in the entire space will be removed and double bagged
and disguarded as asbestos waste.
17.
DEP Hard Copies (68 Boxes) / DEP Box 54 / 115 BROADWAY Block: 50 Lot: 1 BIN: 1001003 United States Realty Building
NYC-WTC_000132947Machine-extracted title Lab reportSummary Report of asbestos air monitoring conducted during cleanup of loose debris at 115 Broadway between August and October 2001; all air samples passed clearance criteria under 0.01…
COMCO, asbestos contractor removed
loose debris and the affected area was HEPA vacuumed and wet wiped.
DEP Hard Copies (68 Boxes) / DEP Box 54 / 115 BROADWAY Block: 50 Lot: 1 BIN: 1001003 United States Realty Building
NYC-WTC_000132841Machine-extracted title Lab reportSummary Table of contents for reports covering emergency cleanup and air quality testing at 111 and 115 Broadway in late 2001.
All air filters within the said fan
0 units wore removed and disposed of as asbestos waste.
In addition to the above, CTS!
DEP Hard Copies (68 Boxes) / DEP Box 54 / 115 BROADWAY Block: 50 Lot: 1 BIN: 1001003 United States Realty Building
NYC-WTC_000132881Machine-extracted title Permit applicationSummary Consulting and testing services report on asbestos air quality monitoring at various floors of 115 Broadway in September 2001.
Some
dust sample results tested positive for presence of asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 54 / 115 BROADWAY Block: 50 Lot: 1 BIN: 1001003 United States Realty Building
NYC-WTC_000132945Machine-extracted title Permit applicationSummary Consulting and testing services report on asbestos air quality monitoring at various floors of 115 Broadway in September 2001.
utilized as a staging area for personnel and
supplies;
6 All rags used and used disposable PPE were discarded as
asbestos
DEP Hard Copies (68 Boxes) / DEP Box 54
NYC-WTC_000132543Machine-extracted title Permit applicationSummary A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
utilized as a staging area for personnel and
supplies;
6 All rags used and used disposable PPE were discarded as
asbestos
DEP Hard Copies (68 Boxes) / DEP Box 54 / 115 BROADWAY Block: 50 Lot: 1 BIN: 1001003 United States Realty Building
NYC-WTC_000132944Machine-extracted title Permit applicationSummary Consulting and testing services report on asbestos air quality monitoring at various floors of 115 Broadway in September 2001.
Following the
evaluation of the entire building, the following remediation plan was implemented:
1 The clean—up was performed by a licensed Asbestos contractor
DEP Hard Copies (68 Boxes) / DEP Box 54
NYC-WTC_000132542Machine-extracted title Permit applicationSummary A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
Following the
evaluation of the entire building, the following remediation plan was implemented:
I The clean—up was performed by a licensed Asbestos contractor