SCOPE OF WORK FOR
u
ti ~`i~ GENCY CLEAN-UP OF DUST DAMAGED SURFACES
(o ~Ø t 115 BROADWAY, ENTIRE BUILDING
Iva
NEW YORK, NEW YORK
'lie" subject building is situated diagonally across from the World Trade Center on the
south side adjacent to Liberty Plaza Park. The dust and debris entered the building via
open and broken windows. The lower floors accumulation of dust was more than the
upper floors.
The building consists of main lobby on Broadway & Trinity Side, 21 floors (= 19,000
SF/Fl.), Penthouse and basement. Building personnel immediately had the building
HVAC system shut down. All power to the building was lost, including the use of the
elevators.
The project began on September 19th and completed by October 1st, 2001. Following the
evaluation of the entire building, the following remediation plan was implemented:
1 The clean—up was performed by a licensed Asbestos contractor
(Complete Environmental Services, Inc. A/K/A COMCO) and
monitored by CTSI;
2 All affected areas were restricted to emergency response
personnel;
3 All emergency response personnel working in the building were
wear appropriate personal protective equipment, upon exiting the
•
NYC-WTC 000132944