Letter defining emergency generator usage for 7 WTC · page 1NYC-WTC_000167726
Official correspondence clarifying that OEM backup generators are only used during power loss or catastrophes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal re: noise levels at generator room, Mar 1998 · page 1NYC-WTC_000167729
Cover sheet for a fax transmission regarding expected noise levels outside the emergency generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter describing existing fuel oil lines at 7 WTC, Mar · page 1NYC-WTC_000167732
Letter from Ambassador Construction describing existing fuel oil lines and fireproofing details within the shaft at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM equipment data summary memo, 7 WTC, Feb 26, 1998 · page 1NYC-WTC_000167734
Memo summarizing outstanding OEM equipment product data and catalog cuts for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Design development responses, 7 World Trade Center emergency operations center, · page 1NYC-WTC_000167738
Responses to Department of Design and Specifications review comments on architectural outline specifications for the Mayor's Office of Emergency Management facilities at 7 World…
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM antenna placement memo regarding roof interference, Feb 4, 1998 · page 1NYC-WTC_000167739
Memo noting that OEM antennas cannot fit on the 7 World Trade Center roof without interference and requesting inspection of alternative City-owned locations.
Citywide Administrative Services, Dept. of · Box 7DCAS
MOEM 7 WTC design memo letter, Feb 1998 · page 1NYC-WTC_000167740
Letter enclosing a memo regarding the design of the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Design review correspondence for OEM, Feb 4, 1998 · page 1NYC-WTC_000167741
Cover letter transmitting a memo regarding design specifications for the Mayor's Office of Emergency Management at 7 World Trade Center to City officials.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM 7th and 23rd floor preliminary construction budget, February 1998 · page 1NYC-WTC_000167743
Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM 7th and 23rd floor preliminary construction budget, February 1998 · page 2NYC-WTC_000167743
Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM 7th and 23rd floor preliminary construction budget, February 1998 · page 5NYC-WTC_000167743
Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM security vendor inquiry memo, Jan 21, 1998 · page 1NYC-WTC_000167749
Internal memo inquiring about the resolution of a security issue and confirming the selection of a consultant for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re: OEM security vendor selection, Jan 21, 1998 · page 1NYC-WTC_000167750
Inquiry regarding the resolution of a security issue and confirmation of the selected vendor for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo re: OEM security vendor selection, Jan 21, 1998 · page 2NYC-WTC_000167750
Inquiry regarding the resolution of a security issue and confirmation of the selected vendor for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM floor plan correspondence, Jan 30, 1998 · page 1NYC-WTC_000167755
Architectural correspondence regarding layout and room specifications for the Mayor's Office of Emergency Management on the 23rd floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
OEM project distribution memo, Jan 21, 1998 · page 1NYC-WTC_000167756
Internal memo distribution regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
DCAS memo re: non-standard millwork for OEM, Dec 19, 1997 · page 1NYC-WTC_000167758
Memo listing proposed non-DCAS standard millwork items for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural design services proposal, 7 WTC, October 1997 · page 1NYC-WTC_000167764
Proposal for additional architectural services to create AutoCAD files for 23rd floor existing conditions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
FAX cover sheet for 7WTC emergency management, Oct 1997 · page 1NYC-WTC_000167765
Cover sheet for a fax regarding the Mayor's Office of Emergency Management and 7 World Trade Center operations.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet regarding 7 World Trade Center project, Oct · page 1NYC-WTC_000167766
Cover sheet for a fax transmission concerning the Mayor's Office of Emergency Management at 7WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet from DCAS regarding OEM meeting, Oct 1997 · page 1NYC-WTC_000167767
Cover sheet for a fax transmission concerning the Mayor's Office of Emergency Management kickoff meeting.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding OEM consultant interviews, June 1997 · page 1NYC-WTC_000167768
Internal memo notifying staff of upcoming meetings to interview consultants for the 7WTC design project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Sales quotation and order form from EIS International, June 1997 · page 1NYC-WTC_000167770
Order form from EIS International providing a sales quotation for telephone services to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Sales quotation and order form from EIS International, Aug 1997 · page 1NYC-WTC_000167773
Fax transmission of a sales quotation form from EIS International to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Sales quotation and order form from EIS International, Aug 1997 · page 2NYC-WTC_000167773
Fax transmission of a sales quotation form from EIS International to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Sales quotation for EOC design consulting services · page 1NYC-WTC_000167775
Quotation and order form from EIS International for emergency operations center design consulting services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Funding authorization memo for 7 WTC lease, March 1998 · page 1NYC-WTC_000167808
Memo from the Office of Management and Budget confirming available funds for the Mayor's Office of Emergency Management lease at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost estimate transmittal letter, Mayor's Office Emergency Management, Feb 1998 · page 1NYC-WTC_000167833
Letter forwarding a construction cost estimate of over $10 million for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost estimate transmittal letter, Mayor's Office Emergency Management, Feb 1998 · page 2NYC-WTC_000167833
Letter forwarding a construction cost estimate of over $10 million for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo regarding OEM design fees and program review, October 1997 · page 1NYC-WTC_000167841
Memo dated October 14, 1997 regarding delays in finalizing design fees pending OEM program review and approval of consultant services.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Painting metal panels, Nov 1998 · page 1NYC-WTC_000167863
Transmittal regarding painting procedures for metal panels in the field of construction at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal: OEM project documents, Nov 1998 · page 1NYC-WTC_000167864
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Day tank leak switch confirmation, Dec 1998 · page 1NYC-WTC_000167868
Confirmation that the day tank rupture basin switch will de-energize transfer pumps and activate alarms upon leak detection.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmittal: OEM project documents, Feb 1998 · page 1NYC-WTC_000167869
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Additional services authorization: OEM security revisions, Dec 1998 · page 1NYC-WTC_000167870
Authorization for revised scope of architectural, electrical, and security design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Roof shed construction site visit, Dec 1998 · page 1NYC-WTC_000167872
Report on a roof site visit noting items related to roof shed construction for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax memo: Drainage and slab replacement drawings, Dec 1998 · page 1NYC-WTC_000167873
Transmittal of additional drain requirements and revised drawings for slab replacement at the loading dock.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo: Transformer and panel installation locations, Nov 1998 · page 1NYC-WTC_000167880
Transmittal of revised drawings specifying transformer installation in room 23-05 and panel locations for OEM.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo: FSK clarifications and louver shop drawings, Nov 1998 · page 1NYC-WTC_000167881
Transmittal of clarification documents and louver shop drawings for construction use at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo: Revised and new FSKs, Nov 1998 · page 1NYC-WTC_000167886
Transmittal of revised and new FSK drawings for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting construction variations for Mayor's suite, Oct 1998 · page 1NYC-WTC_000167896
Official request from OEM Director for specific construction changes to the Commissioner's Suite.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax clarifying floor box locations for telecom, Oct 1998 · page 1NYC-WTC_000167899
Transmission of FSK clarifications regarding raised floor box locations and coordination requirements.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax regarding structural support and camera locations, Oct 1998 · page 1NYC-WTC_000167904
Correspondence detailing structural support for microwave dishes and security camera placement.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting document distribution for OEM project, Oct 1998 · page 1NYC-WTC_000167909
Letter instructing staff to distribute project documents to various city agencies and consultants.
Citywide Administrative Services, Dept. of · Box 7DCAS
Architectural plan of corridor and suite layout, Oct 1998 · page 1NYC-WTC_000167912
Floor plan excerpt showing corridor connections and room layouts within the Mayor's suite.
Citywide Administrative Services, Dept. of · Box 7DCAS
Memo requesting drawing revisions for main entrance doors, Sep 1998 · page 1NYC-WTC_000167918
Correspondence regarding requested revisions to main entrance door drawings and package handling.
Citywide Administrative Services, Dept. of · Box 7DCAS
Ambassador Construction fax cover, Sep 1998 · page 2NYC-WTC_000167923
Facsimile transmission cover sheet from Ambassador Construction Co. dated September 15, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project schedule excerpt, Office of Emergency Management, 1997 · page 1NYC-WTC_000167934
Document page containing a project schedule with tasks and dates for the Office of Emergency Management from mid-1997.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project schedule excerpt, Office of Emergency Management, 1997 · page 2NYC-WTC_000167934
Document page containing a project schedule with tasks and dates for the Office of Emergency Management from mid-1997.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project schedule chart, Mayor's Office of Emergency Management, Sep-Dec 1998 · page 1NYC-WTC_000167941
Project schedule chart for the Mayor's Office of Emergency Management spanning September through December 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS