DEC. 3. 1 998 4:51PM SME HAYDEN CONNELL ARCHITECTS NO. 4170 P. 2/2
SwankeHatdeii Connell Architects
Memorandum
Project Name and Address: Project Ne:
5576A
Mayor’s OCBce of Emergency Management Project Direct or/Manager:
7 World Trade Center Meinhardt/Aliotta
New York, New York Client:
Silverstein Properties, Inc,
Subject:
Roof shed construction
To From Date Prepared
Martin Schneider / Ambassador Construction . Juan M. Mejia Decembers, 1998
As per field visit to the roof today with Mr. Weems of Silverstein’s Properties Inc. and Jack Klein of your office the following
items where noted.
1 * Insulated metal panels do not match color control sample.
2- Top of metal deck at shed is not at height indicated on SHCA construction documents; therefore creating a very difficult
flashing detail with existing building louvers,
The above items should be corrected as soon as possible.
If you need any information or coordination from our office in the above matters please call.
CC; Glen Pymento / DCAS
Joseph Domingvez / DCAS
John Hughes / OEM
JoeAliona/SHCA
John Vande Plasse / SHCA
Josh Ginsburg / SHCA
WltSiTStA^EWOOCSMEUOiAMBASfA^R 1»49*VI.DOG
I
Swanke Hayden Connell LtdJS-wanke Hayden Connell & Partneis LLP
295 Lafayette Street, New York, New Yoik 10012
212 226 9696, Fax 212 219 0059
NYC-WTC_000167872