NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Rule 56 revisions overview, 2005

Machine-extracted title · confidence 48%

Summary of Rule 56 revisions and guidance for asbestos regulatory updates.

NYC-WTC_000448496–000448499
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Summary of Major Changes to Industrial Code Rule 56

Project Air Sampling ■ Asbestos Abatement Contractor independent of air monitoring firm (must be contracted separately by owner). ■ Quantity of asbestos containing material in work area determines air sampling requirements for work area. ■ Air Sampling Technician required to be on-site for duration of sample collection. ■ Asbestos Project Air Sampling Requirements - Major Changes: ♦ Air sample log requirements included. ♦ Reduced turnaround time for air sample results. ♦ Defined requirements and criteria for background air samples. ♦ Pre-abatement air samples - replaced with work area preparation samples for large project friable asbestos containing materials. ♦ Negative air exhaust - banking allowed (up to 5 exhaust tubes terminating at one common location - one sample required). ♦ Clearance for Minor Work Areas- required for incidental disturbance and if part of small or large project. ♦ Allow Transmission Electron Microscopy (TEM) instead of Phase Contrast Microscopy (PCM) for clearance. * TEM clearance - Asbestos Hazard Emergency Response Act (AHERA) protocols for clearance air sampling and analysis, unless TEM analysis of failed PCM air samples. ♦ Clarify procedures to follow for recleaning and resampling of work areas with unsatisfactory clearance air sample results.

Asbestos Survev/lnspection ■ When is a survey required and by who? ♦ Prior to Building/structure demolition, remodeling, renovation or repair for non-agricultural buildings/structures with construction commencement before 1974, unless condemned and structurally unsound. ♦ Portion of Building/structure impacted by project shall be inspected/surveyed for asbestos containing material by an asbestos contractor with appropriately certified personnel. ■ Survey Exemptions and what they mean: ♦ Not required for agricultural building. ♦ Not required for structurally unsound structure, but demolition shall be an asbestos project (as per Code Rule 56-11.5). ♦ Not required for owner of one or two-family dwelling, when the owner contracts for but does not control the demolition, renovation, remodeling or repair work. * NOTE: Survey is still required by owner’s agent. ♦ All contractors hired by the owner must still comply with OSHA and EPA, so even if no survey is required by Code Rule 56, all Presumed Asbestos Containing Materials and resilient flooring materials installed prior to 1981 are treated and handled as asbestos containing materials and are assumed to be asbestos containing materials until proven otherwise by appropriate laboratory analyses. ■ Bidding - Concurrent bidding requirements included.

Work Area Preparation ■ Asbestos Abatement Contractor Daily Project Log - summary has been added of required entries by Asbestos Abatement Contractor’s Supervisor. ■ Decontamination Units: ♦ Eliminate airlock at work area. ♦ Define Clean room minimum size. ♦ Include remote personal decontamination system enclosure, as well as when and how they may be used (some special projects, non-friables and tent with glovebag).

Page 2 of 4

CITY_21MC100_003235132

NYC-WTC_000448497

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448497Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Compare copies and versions →