NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Rule 56 revisions overview, 2005

Machine-extracted title · confidence 48%

Summary of Rule 56 revisions and guidance for asbestos regulatory updates.

NYC-WTC_000448496–000448499
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Summary of Major Changes to Industrial Code Rule 56

Why were Code Rule 56 revisions necessary? ■ To bring it into compliance with current federal Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA) regulations. ■ To clarify many portions and include existing Applicable Variances within the revised Code Rule. ■ To streamline its organization to be more user friendly. The revised Code Rule accurately reflects the consecutive steps of an asbestos project.

Supplemental Documents ■ Guidance: ♦ The revised Code Rule cannot address every situation. The Department of Labor is currently developing a guidance document to supplement the regulation and to assist stakeholders in implementing the regulation. This guidance document will be available on the Department’s website for review and use. (The final version of Code Rule 56 will also be available on the Department’s website). ■ Site-Specific Variances will still be required for projects that deviate from Code Rule 56. ■ Applicable Variances (AVs) - Current Applicable Variances are incorporated into the revised Code Rule 56. New Applicable Variances could be generated in the future, if the same type of site-specific variance is repeatedly granted.

ICR 56 Major Changes

Responsibility of General Contractors and Construction Managers ■ Responsible for general supervisory authority on projects their firms are supervising. ■ Must require asbestos contractors on their projects to come into compliance with Code Rule 56. ■ Supervisory requirements are consistent with OSHA.

Cleanup of Uncontrolled Asbestos Containing Material Disturbance ■ Defines who is responsible for cleanup. ■ Property Owner must contract with licensed asbestos contractor for immediate isolation and cleanup of both incidental and uncontrolled intentional disturbance of asbestos containing material. The property owner may pursue legal options for repayment of cleanup costs from the responsible party, but the owner is ultimately responsible for completion of all necessary cleanup by a licensed asbestos contractor.

Definitions ■ Asbestos Project Phasing chart has been added with identification of the various subphases of an asbestos project (Phase lA-IB & IIA-IID). ■ Other major definitions were added for consistency with federal regulation terminology.

Recordkeeping ■ Additional recordkeeping category added for non-abatement asbestos contractors. ■ Project Record requirements for documents to be available on-site during the active portion of an asbestos project.

Notifications ■ Notification requirements clarified for non-continuous asbestos projects.

Page 1 of 4

CITY_21MC100_003235131

NYC-WTC_000448496

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448496Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Compare copies and versions →