Summary of Rule 56 Revisions, NYC DEP

Machine-extracted title · confidence 29%

Summary of asbestos Rule 56 revisions and guidance notes.

NYC-WTC_000448683–000448686
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Summary of Major Changes to Industrial Code Rule 56

Clearance Procedures ■ Exemption for exterior asbestos projects without negative pressure enclosures: ♦ A satisfactory visual inspection shall serve as the clearance for these asbestos projects - exception included for one-two family owner-occupied residential building/structures, when owner accepts asbestos abatement contractor supervisor’s visual inspection. ■ Once appropriate clearance has been obtained for an asbestos project, remaining work area preparation shall be removed, concluding with the decontamination system enclosures.

Waste Removal from site ■ All waste to be removed from work site within ten calendar days after successful completion of Phase I IC clearance procedures for all work areas. ■ All waste removed from site shall be documented, accounted for and disposed of in compliance with EPA National Emission Standards for Hazardous Air Pollutants (NESHAP).

Special Projects ■ In-Plant Operation changes and what they mean: ♦ Same as before, but now allowed asbestos containing material to include any quantity non- friable organically bound (NOB) asbestos containing material, currently in a non-friable intact condition, by outside asbestos abatement contractors. ♦ Note - Only labs currently accredited by the New York State Department of Health Environmental Laboratory Approved Program (ELAP) are allowed to make the NOB asbestos containing material determination from bulk samples of non-friable suspect miscellaneous ACM. ■ Emergency projects-must call for approval to proceed with project. Site-specific variance may be necessary. ♦ Incidental Disturbance Asbestos Project - (less than 10 sq. ft. or 25 lin. ft. incidentally disturbed ACM) corrective action procedures included. ■ Minor Projects - isolated Operations and Maintenance event. ■ Pre-demolition projects - less stringent requirements from normal Code Rule 56 projects: ♦ Non-porous salvage items may be removed prior to abatement - no disturbance of friable or non-friable asbestos containing material allowed during salvage operations. ♦ Porous walls and floors - one layer of plastic sheeting required instead of two layers. Non- porous walls, floors and ceilings don’t require plastic sheeting. ■ Demolition with asbestos containing material in place - similar to AV-106 & AV-107 conditions. ■ Exterior Non-friable roofing, siding, caulking, glazing compound, transite, tars, sealers, coatings and other NOB asbestos containing materials - similar to AV-84, AV-89, AV-119 and typical exterior caulking/glazing site-specific variance. ■ Non-friable flooring and mastic-similar to AV-120. ♦ Note - Beadblaster or other abrasive abatement methods require asbestos project abatement as per full requirements of Code Rule 56 ■ Abandoned pipe/duct/conduit wrap and cut - similar to AV-87, only with less limitations.

Page 4 of 4

CITY_21MC100_003240976

NYC-WTC_000448686

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448686Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Compare copies and versions →