Summary of Rule 56 Revisions, NYC DEP

Machine-extracted title · confidence 29%

Summary of asbestos Rule 56 revisions and guidance notes.

NYC-WTC_000448683–000448686
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Summary of Major Changes to Industrial Code Rule 56

♦ Remote waste decontamination system enclosure eliminated. ♦ Small project personal decontamination system enclosure revised to 3-chambers. ■ Electric shutdown/isolation - shutdown exemption procedures included. ■ Engineering Controls: ♦ Modify negative air requirements. * Eliminate piggy-back and add use of unfiltered booster fans downstream every 25 feet from negative air unit. * Reduce 50 foot exhaust requirement to 15 foot, or if exhaust directly to exterior, then seal openings within 15 feet of exhaust location. * Exemption added for some special projects. ♦ Requirement for use of Manometer on OSHA Class I Large and Small asbestos projects. ♦ Exhaust Termination Location protected/surrounded by construction fencing (minimum of 10’ from exhaust point). ■ Barriers and Exemptions: ♦ Floor, Wall & Ceiling plastic sheeting - eliminate sheeting on removal surfaces. ♦ Negative pressure Tents: * Allowed for any quantity non-friables. * Allowed for any quantity friable thermal system insulations (TSI) w/glovebag abatement. * Allowed for minor and small quantity gross removal of friable asbestos containing material, with attached decontamination system enclosure for small quantity tent work areas. ♦ Fire-retardant Spray Plastic: * In lieu of 2 layers floor, wall and ceiling plastic sheeting. * Applied by trained personnel. ♦ Special Projects Exemptions - See Subpart 11. ♦ Removal of ceilings and components to access asbestos containing material - similar to former AV-86.

Handling ■ Pre-abatement settling period reduced to 4 hours and eliminated for exterior work where negative air ventilation is not required. ■ Sequential Abatement of multiple types of asbestos containing materials within a single regulated abatement work area is allowed as follows: ♦ Top-down abatement and most friable to least friable ♦ For example, ceiling friables (OSHA class I), then other class I friables (thermal system insulations, wall plasters) and class II friables (ceiling tile), then class II non-friables other than flooring, ending with class II non-friable flooring ♦ One complete cleaning at conclusion of each abatement type, clearance at conclusion of all abatement and cleanings ■ When is Dry Removal allowed - never according to the code...guidance issue...obtain written EPA approval first then submit for site-specific variance with EPA approval

Final Cleaning Procedures ■ Process and settling periods: ♦ Still 3 cleans, but exemption from multiple cleans when no layers or reduced layers of plastic sheeting is required, or when tent enclosure is used. ♦ Reduction in some of the settling/drying periods. ■ Visual Inspections required following final cleaning and settling/drying period. ♦ Small and Large size work area visual inspections are to be performed by project monitor hired by building owner independent of asbestos abatement contractor.

Page 3 of 4

CITY_21MC100_003240975

NYC-WTC_000448685

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448685Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Compare copies and versions →