Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
performance and
isomer specificity.
S/N ratio must be >
10:1 for labeled
standards and >5:1
for unlabeled
standards.
PAHs/GS/MS Initial calibration: Perform necessary
prior to sample equipment
analysis or maintenance and
whenever indicated check calibration
by continuing standards.
calibration________
Initial calibration 70-130% of true
Verification: value
immediately after
the initial
calibration curve
Continuing RRFs must be
Calibration: prior to within ± 30% of
analysis at actual calibration
beginning of each mean RRFs: S/N
12-hour shift ratio must be >10:1
for labeled
standards and >
2:5:1 for unlabeled
standards._________
PCBs/GC/ECD Initial calibration: % RSD of CFs must Perform necessary
prior to sample be <20 equipment
analysis or maintenance and
whenever indicated check calibration
by continuing standards.
calibration_______
Initial calibration 85-115% of true
Verification: value
immediately after
the initial
calibration curve
Continuing CFs must be within
Calibration: 15% of initial
beginning of each calibration mean
day, every 10 CFs
samples, and at end
of analytical
sequence
97
CITY_21MC100_003237501
NYC-WTC_000447530
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000447530Source: NYC Law Department, mirrored locally