NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Slreet/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
Tab/e 13-4a. SWttfttiarv of Ca//brat/on Pfocedufos for F/xed Laboratory Ana/vses
Parameter Frequency of Acceptance Corrective Action
Instrument Calibration Criteria
Asbestos TEM Alignment of TEM: NA Perform necessary
performed daily equipment
Magnification: 2x SD must be < 5% maintenance and
monthly__________ cumulative mean check calibration
Camera Constants: 2x SD must be < 5% standards.
monthly__________ cumulative mean
Chrysotile Beam Fibrils must be
Dose: quarterly visible for minimum
of 15 seconds______
Spot Diameter: Variation of spot
quarterly diameters must be
25% of the mean
EDXA Resolution: Mn K peak has
quarterly resolution < 175 eV
at full width half
maximum_________
Plasma Asher: Used to calculate
quarterly time needed to
remove 10$ of
collapsed mixed
cellulos£^sterfilte£
Grid Opening Variation of grid
Measurement: openings must not
performed on 2 % be > 5% of the mean
of grid lot to
determine average
grid opening in mm ’
Silica XRD Standard: daily 80-120% of true Perform necessary
analysis value equipment
maintenance and
Initial Calibration: Acceptable daily
check calibration
whenever there is a standard analysis
standards.
change in hardware results calculated
or when a new set of using this curve;
calibration reference intercept value less
standards are than 5 pg for
prepared primary peak curves
PM 10 Balance Calibration: ±3 pg Perform necessary
daily before use and equipment
98
CITY_21MC100_003237502
NYC-WTC_000447531